An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Generation NetworkGN2 Project Tomaž Kalin tomaz.kalin@dante.org.uk www.dante.net

  2. GN2 Project • Commission contribution 100 M€ • Proposal submission 2 October 2003 • Evaluation • Negotiations March 2004 • Start ~ September 2004 • New GN2 network 1Q 2005

  3. Objectives of the GN2 NGN • Provide IP connectivity for NRENs - yearly growth 2x to 3x • Provide high bandwidth for special appl. • Provide services for GRIDs • Establish customer empowered networks • Responsive to the expectations of the community

  4. Backbone with traditional users Backbone with traditional users NREN 1 GE Geant-2 GRID User IP GE 2x10 Gbit/s VPN IP NREN 2 4 x 10Gbit/s l IP IP 4 x 10Gbit/s l GE 2x10 Gbit/s VPN IP GE GRID User

  5. New Paradigm • GÉANT - emphasis on core network • NREN connecting to PoPs • Change in the basic approach • End-to-End QoS • Whole “chain” • Responsibility of the whole community • Close co-operation

  6. Technology Investigation of Transmission Costs Skepticism re 40 Gbps Interfacing Costs OEO cross connects interesting “All Optical” some way off Emphasis on AAA and Control issues

  7. NORDUnet JANET SURFnet PSNC DFN GARR EVN Traffic Flows over GÉANT SE UK JIVE PL CZ BE NL DE2 DE1 FR CH AT 256M 512M ? 1G  2.5G 10G IT

  8. Backbone with traditional users Backbone with traditional users NREN 1 Geant-2 IP IP SDH NREN 2 GE 2x10 Gbit/s VPN 2.5 Gbit/s SDH 4 x 10Gbit/s l SDH 2.5 Gbit/s GRID User SDH 4 x 10Gbit/s l GRID User GE 2x10 Gbit/s VPN IP IP IP

  9. Activities • Networking (human) • Management • Public relations • Events and conferences • RTD support • NREN developments and support • Foresight study (SERENATE 2)

  10. Service activities • Procurement and Cost Sharing • Network Operations and basic Services • End to End Quality of Service • Connectivity to other World Regions

  11. Joint research activities • Performance Measurement and Management • Security • New Service Development • Test-Beds • Ubiquity (Mobility) and Roaming Access to Services

  12. Global • Europe - new members (NRENs !!!) • GTREN • Latin America • Asia • South Africa • EUMEDCONNECT • SEREEN 2 or a more stable arrangement

  13. RFP • RFP Lunched in January • Proposals due in March • Evaluation committee • Difficult work - “we do not know, what are we buying” • Work should be finished by September • Continuous changeover in early 2005

  14. Conclusion • Exciting • Technology path still not finalised • Large performance increase • Closer to the end user • Joint exercise