1 / 17

Operating & Maintenance Expenditure Forecasts

Operating & Maintenance Expenditure Forecasts. Annaliza Bitantes Energy Regulatory Officer I. Operating & Maintenance Expenditure Forecasts. Payroll Forecasts. Payroll Forecasts. Network Operating & Maintenance Expenditure Forecasts. Network Operating & Maintenance Expenditure Forecasts.

fran
Download Presentation

Operating & Maintenance Expenditure Forecasts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operating & Maintenance Expenditure Forecasts Annaliza Bitantes Energy Regulatory Officer I

  2. Operating & Maintenance Expenditure Forecasts

  3. Payroll Forecasts

  4. Payroll Forecasts

  5. Network Operating & Maintenance Expenditure Forecasts

  6. Network Operating & Maintenance Expenditure Forecasts

  7. Operating & Maintenance Expenditure Forecasts

  8. Operating & Maintenance Expenditure Forecasts

  9. Regulatory Asset Base & Valuation David Dawson ERC’s Regulatory Expert

  10. Optimization RAB • ERC checked on-going projects against RAB and did not identify any overlap in claim of value • Otherwise, ERC has relied on SKM et. al optimization of the RAB • DD adjusts for: • Windfall • Connection assets • Sub-transmission assets via disposals

  11. RAB - Windfall • s.4.8.1 of TWRG indicates that asset lives may differ from those used for financial reporting • s.4.8.3 of TWRG indicates the ERC is interested in treatment of windfall gains and losses • These could arise from valuation or a change in asset lives

  12. RAB – Windfall Potential

  13. RAB – Windfall Treatment • For DD only history known from 1996 appraisal using 30y uniform life

  14. RAB – Windfall DD Review • Windfall applicable for ODRC and appraisal to the extent asset lives now recommended to differ from 30y • DD only looks at substations, lines, interconnectors, meters & communications • Other assets (appraisal) not yet examined in detail

  15. RAB – Subtran & Connection (a) • Focus for DD on plant & equipment • Use SKM data on T/ST & N/C definitions • Resultant outcome is four groupings • Transmission divided by network & connection • Sub-transmission divided by network & connection

  16. RAB – Subtran & Connection (b) • Summary for substations

  17. RAB – Subtran & Connection (c) • Summary % for substations

More Related