A Sustainable Design Solution for Public Health Laboratory Centre at Nam Cheong Street

A Sustainable Design Solution for Public Health Laboratory Centre at Nam Cheong Street Shek Kip Mei. Architectural Services Department. Site Location. Site Analysis. Design Start on 96 / 97 Superstructure Start on Aug. 99 Handover to Client on Sep. 01. Orientation View Noise Source

frayne
Download Presentation

A Sustainable Design Solution for Public Health Laboratory Centre at Nam Cheong Street

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Sustainable Design Solution for Public Health Laboratory Centre at Nam Cheong Street Shek Kip Mei Architectural Services Department

  2. Site Location Site Analysis • Design Start on 96 / 97 • Superstructure Start on Aug. 99 • Handover to Client on Sep. 01 • Orientation • View • Noise Source • Neighbourhood

  3. Challenges Facilities • A System to house the complex • Lab. operation requirements • Integrated network for building services • Pollution Control • Energy efficiency • Sustainability • Enhanced environment • 130 Laboratories • Supporting facilities to the labs • Offices, Conference / Seminar Rooms, Multi-purpose Hall and Carpark

  4. Building Envelope Sun Shading Devices

  5. Building Envelope Sun Shading Devices

  6. Modular Planning Typical Lab Layout Modular Units Typical Floor

  7. Building Services Central Jet Fan Challenges • Safety Vs Energy Saving • Bio-safety Hazard Level 3 laboratories • 110 safety cabinets / fume cupboards • Residential zone • An integrated design • Eliminate “chimneys” • Energy saving

  8. Building Services Variable Sash Exhaust Heat Pipe Safety requires: • Speed • Accuracy • Stability • Heat recovery • no cross contamination • 10 months pay back

  9. Building Services HVAC Work Hygiene • Heat recovery chillers • Water cooled cold rooms • Variable frequency drive AHU/Pump • Energy meters for Energy audit • Zero ozone depletion refrigerant • Variable fresh air for Multi-Purpose Hall / Lecture Theatre / Conference room • Bag-in / bag-out HEPA filter housing • Bio-oxygen generator air purifier • UV light • Design to meet Level 1 IAQ • Fresh air to ASHARE 62-1989

  10. Enhanced Environment Existing Environment Landscape Sketch

  11. Enhanced Environment