Development of Ground-Based GPS Network for Near Real-Time IWV Measurement

This project aims to develop a ground-based GPS network for the near real-time measurement of Integrated Water Vapour (IWV). The data collected will be used for assimilation to improve surface temperatures, nowcasting applications, validation of remote sensing instruments, and complement satellite IWV measurements.

frederickg
Download Presentation

Development of Ground-Based GPS Network for Near Real-Time IWV Measurement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of a Ground Based GPS Network for the Near Real Time Measurement of Integrated Water Vapour (IWV) Jonathan Jones Met Office UK

  2. Why…? • Assimilation of IWV to model (trials have seen 4% improvement of surface temperatures) • Nowcasting applications – extreme weather events etc • Moisture and latent heat are transmitted through the water vapour phase • Validation of other remote sensing instruments (radiosonde, microwave radiometer) • Also complements satellite IWV which only available over open water

  3. Advantages / Disadvantages • Advantages of GPS IWV • All weather operational (vs. MWR) • Continuous, high rate of measurement • Relatively Low cost • (Near) Real-time • Disadvantages • ZTD is an integrated value (vs. radiosonde) • Can’t solve directly slant delay (vs. MWR)

  4. Ground Based GPS Meteorology Ionosphere Dispersive, use L3 to remove Troposphere + Stratosphere Using mapping function we solve to the vertical (Zenith) Zenith Total Delay (ZTD)= ZHD+ZWD ~90% Dry delay (Zenith Hydrostatic Delay ZHD) ~10% Wet Delay (Zenith Wet Delay ZWD)

  5. ZTD to IWV • ZHD mitigated using surface barometric measurements and atmospheric models • ZWD more difficult to predict, varies greatly both spatially and temporally • With further calculation (using surface temperature) we can convert ZWD to IWV • 1mm IWV ≈ 3% Relative Humidity

  6. GPS Data Flow

  7. GPS Processing System • 2 dual-processor PCs running Bernese v5 GPS processing software • ZTD Processing Solutions • Near Real Time solution, ~25min latency • 2 Quality check solutions using more accurate orbits • Quality Analysis • Compare solutions (NRT vs. PP) • Compare against other processing centres • Compare against other obs. methods

  8. Equipment Ashtech Dual Frequency GPS Receiver Data collected by local PC and sent to central processing system for conversion to ZTD and IWV Choke ring antenna, carbon fibre pole

  9. GPS IWV time series vs. RS80 Radiosonde

  10. Approximate Site Installation costs (EURO) • GPS Equipment ≈ 20,000 • PC and UPS ≈ 2,500 • Works Services ≈ 5,000 • Communication connection ≈ 500 • 1 Euro ≈ $1.29 • ~50km spatial resolution required for operational meteorology (COST716) • In UK 50km resolution ≈ 150 station network • 150 station network ≈ 4.2M EURO ($5.4M)

  11. Partnerships • Therefore….Met Office must work with other national agencies to reduce network costs • 2003 to Present – UK National mapping agency (Ordnance Survey GB) ≈ 120 sites • Others (incl. offshore?) ≈ 50 sites ? • Met Office Network = 10 significant locations

  12. Current UK NRT GPS Network (April ‘05)

  13. Output of Data • COST716 format files disseminated to EU scientific community via UK Met Office • COST716 file converted to BUFR (binary format) for dissemination on the GTS • NRT animated 2D plot

  14. Example NRT Animated Plot

  15. The Future • Operational network and processing • Sub-hour processing (sub-hour RINEX) • Increasing network density • Take forward EU action through E-GVAP (EUMETNET Project)

  16. Questions? Jonathan.Jones@metoffice.gov.uk