1 / 9

Logical framework to structure the EDPRS

Logical framework to structure the EDPRS. A quick overview. General format of Logframe. Logical framework to structure the EDPRS. One overall logframe for Growth and Poverty Reduction This logframe will provide the context in which sectoral logframes will be developed.

fredh
Download Presentation

Logical framework to structure the EDPRS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Logical framework to structure the EDPRS A quick overview

  2. General format of Logframe

  3. Logical framework to structure the EDPRS • One overall logframe for Growth and Poverty Reduction • This logframe will provide the context in which sectoral logframes will be developed

  4. Overall lograme for Growth and Poverty Reduction

  5. Specific sector logical frameworks • Several nested logframes for each of the 11 sectors to be included in the EDPRS • The hierarchy of objectives from the overall logframe are shifted up one level for the sector logframes • (Purpose become goal, output becomes purpose)

  6. Lograme for the Health sector

  7. Plan for elaboration of logframes • Development of overall logframe for Growth and Poverty Reduction • Responsibility of Economic Growth and Poverty Reduction Group • Building on high-level objectives identified by individual sectors • Workshop on Thursday 21st to Saturday 23rd September • Sector logframes to be developed in workshops for individual SWGs • Series of workshops to be organised between September 25th and October 11th

  8. Proposed Schedule for logframe training Note: The cross cutting issuesworking group has to sent representatives to each of these workshops

  9. Plan for elaboration of logframes (cont.) • Logframe workshops to be followed up by focus on Monitoring and Evaluation (columns 2 and 3 of logframes) 2nd half of October and November.