An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Amendment of GGPSSO for CAM and CMP Rocío Prieto, Co-Chair CEER LNG TF 20th Madrid Forum 26-27 September 2011

  2. Finalising GPSSO for CAM and CMP • Steps taken after Madrid Forum in March 2011: • Discussion of implementation issues with GSE in June • Main critical points were additional regulatory power and obligation for SSOs to develop secondary markets • Redrafting of the amendment of GGPSSO • mitigation above all of regulatory oversight and the guideline for developing the secondary market • Short consultation of the revised version with EFET and Eurogas • Final redrafting of the GGPSSO • After CEER internal approval publication on the CEER homepage

  3. Next steps GGPSSO • Monitoring of the implementation status of the GGPSSO on CAM and CMP; • Starting end of 2012.

  4. Way forward • Monitoring of the implementation status of transparency rules according to Article 19 Regulation 715/2009 • Compliance of SSOs with 3rd Package; • Stakeholders experience about the appropriateness of the rules that are in place for transparency. • Starting end of 2011.

  5. Thank you for your attention! www.energy-regulators.eu