An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Generator Reactive Capabiltiy Verification By Component Testing Presented to the RC 03/4/03

  2. Problem – Contingency Capability • In some special cases, the full VAR capability of a generator is needed for contingency conditions, not normal conditions. • In these cases, creating the conditions that would require the generator’s full VAR output would be dangerous. • The ISO and Satellites will intentionally not create such conditions. Presented to the RC 03/4/03

  3. Normal Conditions Presented to the RC 03/4/03

  4. VAR Test Conditions Presented to the RC 03/4/03

  5. VAR Test Conditions:Post Contingency Presented to the RC 03/4/03

  6. Solution – Component Certification • Provide these special case generators with an alternative to actual VAR testing. • One alternative could be to require certification of the major components of the generator’s VAR capability: • Synchronous machine • Cooling system • Excitation system • Protection systems • … Presented to the RC 03/4/03

  7. Requirements • Rigorous • Timely • Subject to audit • Accountable • Professional Engineers stamp? Presented to the RC 03/4/03

  8. Next Step • Identify Special Cases • Develop Component Test Requirements Presented to the RC 03/4/03

  9. Questions ? Presented to the RC 03/4/03