Workshop on “The Technology Development & Mechanisation of Mines for enhancing Coal Production & Productivity ” 20th January, 2015 Presentation by Western Coalfields Limited
Western Coalfields Limited • WCL operates 80 Mines (41 UG, 39 OC) in 10 Areas (7 in Maharashtra & 3 in Madhya Pradesh) • WCL contributes more than 7% of the total National Coal Production from its 3.26% of the total National Geological Coal Reserves 2
Western Coalfields Limited Coal Reserves (in Billion Tonnes) (As on 01.04.2013) 3
Unique Feature of WCL • Adverse geo - mining condition • Deep seated Reserve • High stripping ratio • Presence of Black Cotton Soil & Silt • Lower grade Coal • Smaller Capacity Opencast Projects • Very old and extensive UG Mines • Heavy Water seepage (Kamptee Series)
Growth: 10.75% Performance at a Glance : Coal Production Growth: 10.7% 43.65 44.00 43.11 42.29 39.73 Million Tonnes Figures in Million Tonnes 5 5
Growth 8.26 % Performance at a Glance : OB Removal Growth: 8.3% 121.00 130.00 122.49 120.08 115.82 113.69 Million Cum Figures in Million CuM 6
Growth 8.26 % Performance at a Glance : Composite Production Growth: 8.7% Growth: 8.3% Million Cum 7
133.97 WESTERN COALFIELDS LIMITED 45.73 44.70 43.51 126.66 43.21 113.89 106.33 Offtake Performance at a Glance : Coal Offtake Growth 12.65% 45.00 42.56 41.97 39.95 41.55 106.33 45.73 44.70 43.65 43.51 43.21 Coal Production (MT) TARGET (BE) Figures in Million Tonnes 8 45.36 45.51 44.90 42.17
Trend Of Coal Production, Offtake & Operating Profit/ Loss Impact of NCWA-IX Million Tonnes Crore Rs. 9
Strategy adopted for Enhancement of Production 10 *To achieve the production level of 60.00 MTPA, the Volume of OBR will be around 302 Million Cum. i.e. 2.5 times the present level of OBR of 120 Million Cum.
Year wise Opening of Projects 11 Replacement Project
Year wise Opening of Projects 12 Replacement Project
Coal Demand Vis-à-vis Production MILLION TONNES YEAR 13
Group-wise Production Scenario Group-wise Future Production Scenario Total Production Ongoing Projects Million Tonnes Future Projects Existing & Completed Projects Year 14
Share of UG and OC production Total Production Million Tonnes OC UG Year 15
OC Composite Production : Departmental & Outsourcing 335.23 311.72 290.69 253.56 178.87 Figures in Million CuM 16
Opencast : Existing & Required Equipment 17
Proposed HEMM required for new projects (Outsourcing) Excavator (3.1 Cum)- 10, Dumper (18.7 Cum) -54 Excavator (4Cum) -97, Dumper (19.5 Cum) -378 Excavator (10 Cum) -7, Dumper (100 T) -35 & Surface MIner - 4 23
Underground : Existing & Required Equipment 24 24
Underground: New Projects • Introduction of Continuous Miner Package on hiring basis • Mass Production Technology package @ 1 MTY of coal production on Turnkey basis (MDO Route) • Manriding system 28
Coal Evacuation & CHP Required 32 32
Coal EvacuationYear-wise, Mode-wise Fig. in MT
Coal Evacuation of 60 MT by 2019-20 • Presently WCL is maintaining evacuation arrangement for 45 MT through 19 no. of Railway sidings • Additional 7 MT will be evacuated by utilizing spare capacity of existing sidings • Silo arrangement for 2 OC projects (8 MT) & Rail Connectivity (15 Km) up to silos by 2019-20 34
Major area of concern • Availability of experienced Contractors • Availability of required Excavators, Dumpers/Hauling Trucks and matching support equipment in a span of four years for existing and new projects. • Trained Manpower for both Departmental & Outsourced equipment 37
Suggestions • Workshop for Outsourcing Agencies with participation of all Subsidiaries. • Year-wise schedule may also be drawn by Suppliers/Manufacturers • Skill Development Centers at Subsidiary level to tap in-house as well as external (PAPs) potential. 38
Thank You