Module 9: Validation - OQ

Module 9: Validation - OQ. Module 9 Purpose and Objectives. Module Purpose: Process optimization requires understanding the process. The student will review the detail for a Validation. Module Objectives: After this module, you will be able to

gabi
Download Presentation

Module 9: Validation - OQ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Module 9:Validation - OQ

  2. Module 9 Purpose and Objectives • Module Purpose: • Process optimization requires understanding the process. The student will review the detail for a Validation. • Module Objectives: • After this module, you will be able to • Write an Operational Qualification for a Lyophilizer • Think through a Performance Qualification

  3. Overview • Computer & Software Validation • Equipment Systems Validation • Cycles Validation • “Document the Result” vs “Meet a Specification”

  4. Software Validation Security Screen Content Buttons & Lights Alarms Power Failure Software Recovery Radio Freq. Interfer. System Stability Network Connection Paper Charts

  5. Software Validation • Security: • Verify that the access is password protected for each level and screen. • Opportunity to define all screens if not previously done. • Often necessary to implement password security for a system that already has the passwords code. • Document specific personnel and their password authorization levels.

  6. Software Validation 2 • Screen Content: Verify that the information displayed on each screen is correct. • Schematic diagrams must reflect the “as built” equipment. • Look carefully at the labels and content for tables. • Confirm that trend data is accurate for its labels, dates, and data. • Later – test that cycle input data is correctly implemented.

  7. Software Validation 3 • Lights/Switches/Buttons/Devices: Confirm for each screen that all bling-bling does as it had ought to! • Often the same menu is displayed from every screen. Assure that every button on every screen works. • Since every combination is impossible, lay out a scheme for the combinations tested. • Also verify controls on any ancillary panel other than the HMI

  8. Software Validation 4 • Alarms: Tediously test each alarm and document the result. • Where possible simulate an actual failure to cause each tested alarm. • Assure the presence of critical alarms for pressure/time/temperature. • This may take several days • Make note of software alarms that could exist and do not.

  9. Software Validation 5 • Power Failure: Document the result of a power failure. • Check against expectation from an existing SOP, or • Create an equipment specific SOP entry for power failure. • “If there is anything to be done, the person available doesn’t know how to do it!”

  10. Software Validation 6 • Software Recovery: Verify that the software can be restored according to a written procedure. • Can the system be re-installed onto a new computer? • Verify how historical data is backed up. • Verify some of the backed-up data. • Document what was done.

  11. Software Validation 7 • System stability: Verify how difficult or easy it is to hack or “bring down” the system. • Assure that an operator cannot accidentally crash the system.

  12. Software Validation 8 • Network: If data is sent over a network, verify that the data sent is accurate and that the network connection is functional.

  13. Software Validation 9 • RFI: Verify that local RFI doesn’t interfere with data reception. This doesn’t have to be sophisticated.

  14. Software Validation 10 • Paper Charts: Verify that any charts are calibrated, that the pens work, and that an SOP exists to assure their operation over a cycle that is multiple days in duration. • Verify that the recorded data can be identified by color or dot pattern and time.

  15. Systems Summary • Vacuum System • Refrigeration and Heat Transfer • Air/Nitrogen/Gas Filtration • Stoppering • Chamber • Condenser • Isolation Valve • Door(s) • Instrument Calibrations

  16. Systems Validation 1 • Vacuum System • Pump Down Rate • Leak Rate <0.02 mbar-liter/sec • Blank Off Vacuum • Ultimate Low Pressure

  17. Pump Down Rate The pipe section with the smallest conductance will determine the maximum conductance. A pipe is a resistor in a linear circuit.

  18. Leak Rate Parenteral Drug Association Spec.

  19. Lyo Volume Measurement

  20. Lyo Volume Measurement • Volume of Atmospheric Air (23C) Needed to Raise the Pressure from 100mT to 500mT Moles of Gas at 100 mT Moles of Gas at 500 mT (ignores bottle volume) Approximate Bottle Volume Needed in order to obtain an “on scale” measurement.

  21. Lyo Volume Measurement

  22. Systems Validation 2 • Refrigeration and Heat Transfer • Record Suction/Head Pressure • Note Oil Level • Verify operation with only 1 compressor

  23. Systems Validation 3 Air/Nitrogen/Gas Filtration • Verify gas pressures • Assure filter integrity after a fast vacuum break • Assure adequate Nitrogen. • This check is probably not provided by the Lyo Manufacturer and may be part of an SOP rather than a mechanical alarm.

  24. Systems Validation 4 • Stoppering: Calculate the stoppering pressure per vial for the largest and smallest vial.

  25. Stoppering - continued • Ram Pressure x Cylinder Area = Force • Force/(Vials on Shelf) = Force/Vial • Force/(Shelf Area) = Shelf Pressure • Vials begin to break at about 25 lbf (111 N) • Vials fail to stopper with less than 4 lbf (17.8 N) • For most vials a setting of 10 psig is acceptable. • Shelf Pressure = 10 psi (69 kPa) • Verify the SOP for Stoppering – especially if it is manual.

  26. Systems Validation 5 • Chamber/Shelves • Determine shelf flatness • Important for stoppering • Determine shelf temperature uniformity • Many thermocouples • Measure during temperature ramps as well as steady state. • Specification can be + 1C • Drain • Can broken glass get trapped in the diaphragm valve seal below the chamber? If YES, then verify a procedure to assure that the valve will hold vacuum for every run. • Chilling Rate • Measure shelf chilling rate under full load from 0 to -50C

  27. Systems Validation 6 • Condenser • Maximum Condenser Capacity • Test, but don’t exceed mnfg’s stated capacity. • Record whether condenser T varies with load. • Minimum Condenser Temperature • At three different shelf temperatures. • Shelf set point = -50C • Shelf set point = -20C • Shelf set point = +30C • For each shelf set point determine condenser T when there are 2 condensers. • Condenser Chilling Rate • Monitor condenser coils during chilling from 0 to -60C.

  28. Systems Validation 7 • Isolation Valve • Gas Leakage: • Evacuate Chamber & Condenser • Close Valve • Raise chamber pressure to ~½ atmosphere. • Compare Condenser pressure to “normal” leak rate.

  29. Systems Validation 8 • Door(s) • Verify the door closing procedure. • Does it require a slight chamber vacuum?

  30. Systems Validation 9 • Instrument Calibrations • Do these UP FRONT

  31. Cycle Validation 1 • Sterilization: A Lyo is not an autoclave. • Map the autoclave with thermocouples to find the 8 coldest points. • Temperatures > 121°C during the SIP hold for all times. • Saturated Steam conditions exist. • All temperatures in the chamber are within 2C of each other. • Use biological indicators and verify a 12 log reduction.

  32. Cycle Validation 2 • Lyophilization: • Demonstrate an acceptable full scale run with a simulant such as 2% Mannitol. • Perform a choked flow analysis according to the procedure of • James Searles, Observation and Implications of Sonic Water Vapor Flow During Freeze-Drying AMERICAN PHARMACEUTICAL REVIEW 2004, VOL 7; ISSU 2, pages 58-69

  33. Cycle Validation 3 • Filter Integrity • Verify the automatic cycle. • Or Verify the SOP. • Integrity testing should be performed between every cycle.

  34. Cycle Validation 4 • Stoppering • Verify the automatic cycle • Or Verify the SOP • Assure and verify a loading pattern for partial loads. • Verify that all vials are stoppered in a full load.

  35. Cycle Validation 5 • Clean in Place • Verify the automatic cycle • Use riboflavin and a black light to assure coverage during CIP.

  36. Time to Validate • 8 to 12 Weeks. • 1 or 2 Personnel • Calibration of gauges in advance • Adequate temperature logging devices.

  37. Summary Security Screen Content Buttons & Lights Alarms Power Failure Software Recovery Radio Freq. Interfer. System Stability Network Connection Paper Charts • Vacuum System • Refrigeration and Heat Transfer • Air/Nitrogen/Gas Filtration • Stoppering • Chamber • Condenser • Isolation Valve • Door(s) • Instrument Calibrations • Sterilization • Lyophilization • Filter Integrity • Stoppering • Clean in Place

  38. Exercise 9.1: • Flowchart the PQ for a real phase III product expecting a PAI*. • Does the lyo have to be run at the real lot size? • How many runs have to be done? • What cycle conditions should be used? • Should the target parameters be set to operate at the edges of temperature or pressure ranges? • Can the product used for validation be sold? *PAI = Pre Approval Inspection from FDA happens 60 or more days prior to approval for sales.