SR 60/US 98 Intersection Improvements

Presented to: Polk County Transportation Planning Organization Presented by: Florida Department of Transportation District 1 October 13, 2011. SR 60/US 98 Intersection Improvements. US 98 Improvement Projects. Projects 2, 4 & 5: Under Construction

gabi
Download Presentation

SR 60/US 98 Intersection Improvements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presented to: Polk County Transportation Planning Organization Presented by: Florida Department of Transportation District 1 October 13, 2011 SR 60/US 98 Intersection Improvements

  2. US 98 Improvement Projects • Projects 2, 4 & 5: Under Construction • Project 3: Final Design & Right-of-Way Acquisition • Project 1: SR 60/US 98 Intersection Improvements from SR 60 to Manor Drive & along SR 60 to US 17

  3. Project Limits • SR 60 from east of Richland Road to west of US 17 • US 98 from SR 60 to south of Manor Drive

  4. Scope of Work • Intersection Improvements • New turn lanes at three intersections • Replace asphalt with concrete • Bicycle Lanes • New Sidewalks • Improved signalization, drainage, lighting, landscaping & signage throughout project limits

  5. Replace Asphalt with Concrete • The existing asphalt pavement at the SR 60/US 98 intersection will be replaced with concrete in these areas: • SR 60 (Van Fleet Drive) From West of US 98/ Broadway Avenue to east of Wilson Avenue • US 98 just north of SR 60

  6. Turn Lane Improvements • SR 60/US 98: • Triple left turns on SR 60 eastbound • Dual right turns on SR 60 westbound • Triple left turns on US 98 southbound • Dual left turns & new right turn on Broadway Avenue Key = Existing Turn Lane = New Turn Lane

  7. Turn Lane Improvements • SR 60/Wilson Avenue: • Extending right turn lanes through the intersection for both eastbound & westbound on SR 60 Key = Existing Turn Lane = New Turn Lane

  8. Turn Lane Improvements • SR 60/Wal-Mart Entrance: • Extending right turn lanes through the intersection for both eastbound & westbound on SR 60 Key = Existing Turn Lane = New Turn Lane

  9. Sidewalks/Bicycle Lanes • New Sidewalks: • Both sides of SR 60 (Van Fleet Drive) • East side of US 98 from SR 60 to south of Manor Drive • Bicycle Lanes: • Along SR 60 & US 98 throughout project limits Key New Sidewalk

  10. Construction Timeline • Project Start Date • October 15, 2011 • Project Estimated Completion • Fall of 2013

  11. Lane Closures • Permanent Lane Closures During Construction • Additional Evening & Weekend Temporary Lane Closures

  12. Communications • RoadWatch Updates & Press Releases • Fact Sheets & Fliers • Website: www.idriveus98.com • Public Meetings • Business Visits • Special Briefings • Media Interviews Photo Courtesy of the Ledger

  13. Project Team

  14. Public Information Officer • Ken Nelson, APR • Public Information Officer • Cell: 863-303-3209 • Office: 863-533-6800, Ext. 6 • E-Mail: knelson@aimengr.com • Website: www.idriveus98.com Photo Courtesy of the Ledger

  15. Questions? SR 60/US 98 Intersection Improvements