1 / 6

PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe Lubenow Marc McCrery

PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe Lubenow Marc McCrery . Industry USPS. DESIRED OUTCOME. Issue Statement:

gaerwn
Download Presentation

PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe Lubenow Marc McCrery

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe Lubenow Marc McCrery Industry USPS

  2. DESIRED OUTCOME Issue Statement: To study and recommend changes in presort software and sortation levels to improve the overall pattern of containerization by: 1) Reducing or eliminating residual mail, and 2) Reducing or eliminating inefficient use of containers. Desired results: Reduce operational costs for mailers and USPS - Improve consistency of mail delivery - Improve efficiency of drop shipping - Maintain/improve penetration of system when not in conflict with above

  3. RECENT SIGNIFICANT ACCOMPLISHMENTS • 5-digit scheme for parcels (L606) • Initiatives to increase pallet and decreased sack utilization • Co-packaging of automation and presorted flats within the same STD or PER package • L006 Metro Scheme • Options to reduce letter trays • R2001 implementation issues • PAVE issues

  4. CURRENT STATUS/INITIATIVES • 5-digit scheme for flats • List of 3-digit ZIPS without value • Allow certain Mixed mail on BMC pallets in order to reduce residual mail • Combining weeklies and monthlies -- labeling requirements • Improved prep requirements for “fletters” • Enhanced prep for BPM flats • Formalized prep requirements for flat-sized pieces in letter trays • Forum for discussion of Product Redesign and Mailing Industry Task Force issues/proposals

  5. FUTURE GOALS • Full merging (CR/5D) of non-AFSM 100 compatible flats for dispatch to delivery units • Explore the required use of “OELs” in preparation of advanced package sorting equipment deployment • Allow carrier-route ID on non-carrier route flats • Increase the combining of letter mail trays from multiple mailings on pallets • Explore palletization for First-Class Mail • Jointly pursue flats prep enhancements with Product Redesign and Engineering

  6. OBSTACLES / TIMELINE • Optimization is an lofty goal and, to a certain degree, a moving target • Consequently, based on the importance of its mission and the value of its output, the work group has enjoyed a long life and will continue to have unquestionable value in the foreseeable future.

More Related