Mar 26 th 2012. Status Report #07 AVTS Automated Vehicle Tracking System. David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection system used to build a database for law enforcement to utilize when searching for vehicles. Need for Design
E N D
Mar 26th 2012 Status Report #07AVTS Automated Vehicle Tracking System David Brenner Caleb Douglas Ahmed Elsherif Michael W. Timme An automated license plate detection system used to build a database for law enforcement to utilize when searching for vehicles.
Need for Design • Aid in the apprehension of suspects and the rescue of abductees in the event that vehicular information is known. • Milestones • Assembly – 02/24/2012 04/12/2012 • GUI Completion – 03/1/2012 • Server Integration – 03/30/2012 • Data Encryptions – 04/10/2012 • License Algorithm Completion – 04/17/2012
Need for Design • Aid in the apprehension of suspects and the rescue of abductees in the event that vehicular information is known. • Milestones • Assembly – 02/24/2012 04/12/2012 • GUI Completion – 03/1/2012 • Server Integration – 03/30/2012 • Data Encryptions – 04/10/2012 • License Algorithm Completion – 04/17/2012
Recent Tasks • Image Processing • Obtained the First of Two Demo Images • No Other Pertinent Updates • Panda Board Automation • No Pertinent Updates • Server Automation • No Pertinent Updates
Recent Tasks • User GUI Access • Test GUI Has Been Implemented • Prototype • Modifications Have Been Completed • Circuitry Has Been Installed • Milestone Complete • Final Report • Began Writing First Draft
Ongoing Tasks • Image Processing • Tweak Algorithm • Work with 2+ demo images • Improve performance • Panda Board Automation • Finalize Automation Process • Panda-Server Integration • All Pieces Need to Work Together
Ongoing Tasks • User GUI Access • Improvements are Imperative • Final Report • Continue to Write • First Draft Due - 04/2/2012
UpcomingTasks • BBQ at David’s House – xx/xx/xxxx • Design Demo Day Poster – 04/09/2012 • Demo to Professor – 04/13/2012 • Final Report 2nd Draft – 04/16/2012 • Demo Day – 04/19/2012 • Final Submission – 04/25/2012 • Final Report, Evaluations, Project File