120 likes | 238 Views
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (from Bj. 02). The M oTeC Dataloggingsystem was released by Porsche under the following conditions of installation. Fixingmaterials as tape, velcro or Ty Raps etc. are free.
E N D
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP(from Bj. 02) The MoTeC Dataloggingsystem was released by Porsche under the following conditions of installation. Fixingmaterials as tape, velcro or Ty Raps etc. are free.
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Preparations: Install velcro at the backside of the Datenlogger, Laptrigger and MDD (Mini Dash Display).
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Preparations Fix doublesided tape at the bottom of the acceleration sensor
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Preparations Uninstall the cover of the right A - Säule, increase the diameter of the hole for the MoTeC com port
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Preparations Turn diagnosisconnector of ABS and Kombi. ( Loosen right screw in drivingdirection, turn stay of diagnosisconnector for 90°, then retighten screw) Fix accerlerationsensor in the middle of the tunnel ---> important: wireharness always has to point in rear direction
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Preparations Remove cover of switchboard Install datalogger in passenger footareafront right Insatll laptrigger with stay at the rear side window
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Wireharnes Fixpoint for the layout of the MoTeC System wireharness ..... Position in car short before crossing of connectors Data and CAN.
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Wireharnes Layout wireharness in direction of starter cable to the rear Connectors for DATA and CAN
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Wireharnes : Connector accelerationsensor Lay out connectingcable for Laptrigger receiver at the bar of the rollbar.
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Wireharnes Lay out connector for display behind switchboard to airvent outlet and guide out of the right side of the outlet. Leave space for connecting wire in the cover of switchboard.
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Wireharnes Lay out connecting wire for the com port in direction of supportframe and fix switch in the forseen hole with 2 M3 screws.
Installinginstruction MoTeC Datenlogger for 996 GT 3 CUP (ab Bj. 02) Install MDD (Mini Dash Display)in stayframe and fix it on top of the awitchboard with tape or screws.