An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Launching PIRLS 2011 Ina V.S. Mullis and Michael O. Martin 1st Meeting of PIRLS 2011 National Research Coordinators Madrid, Spain February 20-22, 2008

  2. Launching PIRLS 2011 2008 Feb 20-22 1st NRC Meeting, Madrid • Plan upcoming activities • Begin implementation • Sampling • Framework update • Passage selection • Other initiatives

  3. Launching PIRLS 2011 Contexts for Discussion • Maintaining trend • Schedule • Resources

  4. ** Important Lesson ** When measuring change, do not change the measure. Albert E. Beaton John W. Tukey

  5. ** Extension to Important Lesson ** When measuring change, you sometimes have to change the measure because the world is changing. Ina V.S. Mullis Michael O. Martin

  6. Changing World • Education policies • Curriculum frameworks • Societal changes • Technical changes • Shifting demographics • Policies for greater inclusion • Methodological advances • Catastrophic events

  7. If don’t change the measure to some extent • May be making changes anyway since the contexts have changed • Cannot stay at the forefront of providing high-quality measures • Cannot provide information on topics policymakers and educators find important

  8. Resolving Tension Between • Maintaining continuity with the past procedures • Maintaining current relevance in a changing context

  9. Keep Present as Point of Reference • Link backwards while moving forwards • Keep substantial portions of assessment constant (e.g., 3 literary and 3 informational passages) • Introduce new aspects carefully and gradually (e.g., 2 literary and 2 informational passages) • Plan as trend assessment

  10. In Summary, Measuring Trends • Is fundamental to educational improvement • Is extremely complicated • Needs to be done with common sense • Needs to use highest methodological standards

  11. Overview of PIRLS 2011 Schedule • - Year of the Framework and Passages • - Year of Instrument Development • - Year of Field Test and Finalizing Instruments – Southern Hemisphere • - Year of Data Collection and Processing • - Year of Data Analysis and Reporting • - Month of the International Database

  12. Upcoming Schedule Highlights 2008 Apr 30NRCs finish submitting passages Jul 30-Aug 1 1st RDG meeting - Finalize framework - Review passages (10 + 10) - Refine passages (6 + 6) - Review PIRLS 2011 Item and Scoring Guide Development Manual Aug 30 Framework to printer

  13. Upcoming Schedule Highlights 2008 Nov 2-72nd NRC Meeting, Amsterdam • Distribute published framework • Select final field test passages (4 + 4) • Participate in item writing workshop • Review background questionnaires

  14. Upcoming Schedule Highlights 2009 Mar 2-52nd RDG meeting to review items and scoring guides for field test Apr 1-3 1st QDG to review and update background questionnaires May 31-Jun 5 3rd NRC meeting, Vilnius to review all field test materials

  15. Upcoming Schedule Highlights 2009 September Translation and layout verification begin OctoberWithin-school sampling for field test IEADPRC conducts data entry seminar

  16. Upcoming Schedule Highlights 2010 Jan 31-Feb 5 4th NRC meeting to conduct constructed-response scoring training for field test Feb 15-March 15 *** Conduct Field Test *** Apr 30 All field test data to IEA DPRC

  17. Upcoming Schedule Highlights 2010 June 3rd RDG to review field test results and recommend passages and items June 2nd QDG to review field test results and recommend questionnaires July 18-23 5th NRC meeting to finalize PIRLS 2011 assessment materials

  18. Upcoming Schedule Highlights 2010 Aug 15 Data collection materials posted on web October-December *** Data Collection *** Southern Hemisphere

  19. Upcoming Schedule Highlights 2011 Feb 13-18 6th NRC meeting to conduct constructed-response scoring training and finalize Encyclopedia outline, curriculum questionnaire, etc. March-June *** Data Collection *** Northern Hemisphere

  20. Upcoming Schedule Highlights 2011 Jul 30 All data to IEA DPRC Sep 25-30 7th NRC meeting, Hamburg to review country data and international report outline and exhibits 2012 Feb 22-24 4th RDG meeting to conduct scale anchoring

  21. Upcoming Schedule Highlights 2012 Apr 22-27 8th NRC meeting to review draft international report July Print PIRLS 2011 International Report Sep 25 Release PIRLS 2011 International Report

  22. Upcoming Schedule Highlights 2013 Jan 4 Distribute PIRLS 2011 International Database Jan 20-25 9th NRC meeting to conduct international database training

  23. Launching PIRLS 2011 Ina V.S. Mullis and Michael O. Martin 1st Meeting of PIRLS 2011 National Research Coordinators Madrid, Spain February 20-22, 2008