AMS operations on March 5-10

AMS operations on March 5-10. Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai , Sabellek DSP load new programs and files (including Flight Trigger) Kounine , Sabellek , Casaus , Pilo , Bindi , Ambrosi

gaille
Download Presentation

AMS operations on March 5-10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMS operations on March 5-10 Mike Capell

  2. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada • JMDC new program and files (power steps) Cai, Sabellek • DSP load new programs and files (including Flight Trigger) Kounine, Sabellek, Casaus, Pilo, Bindi, Ambrosi • Checking all software and files, as previous • DAQ operations at low rate (50Hz, prescale), Sabellek+Ambrosi • DAQ operations at highest rate (2-3KHz, lower TOF and ECAL thresholds), as previous • JMDC DAQ Stability (long runs without problems in “AA”, “BB” config) - shift • Test of new AB and BA configurations – Sabellek+Shift • AA, AB, BA, BB Configurations - Same • Operations with “A & B” power on E, R, S – Sabellek+Pilo, Casaus, Bindi • Star Tracker readout – Ambrosi + Lebedev +Alberti • GPS synchronization testing Lebedev+Zurbach • BRICK-5 program testing Lebedev+E, R, S Shift • TOF HV Equalization Scans – Bindi+Quadrani • ACC HV - Chung • ECAL Standalone Trigger Tests – Pilo+Rosier • Tracker Thermal Interlock Test + Shift

  3. People who need to do this work should do it while on shift. Shift Leader can coordinate • Sabellek and Cai (mostly) not on shift to monitor (fix) JMDC performance • Shift Leader to keep notes on what is going on (in elog)

  4. Power on A side • Install new JAP • Execute all the power steps • Install latest software where needed on A side electronics • Run in stable condition (short period, including trigger rate test) • Allow all Detectors to do their various tests • Finalize all the software/config file etc. for flight on A side • Run in stable condition (long period) in AA Configuration (JMDC 0, etc.) • Power on B sides of E, R, S (keep A side on) • Install latest software on B sides • Test running with power on A&B side • Power off A sides of E, R, S • Run in stable conditions in AB, BA configurations (JMDC 2, 1) • Allow all Detectors to do their various tests • Finalize all the software/config file etc. for flight on B side • Run in stable condition (long period) • Testing Tracker interlock • Turn off detectors (go to STANDBY, PDS, J, M, TT, UG on) • TRD Monitoring • Power off