An Integrated Industrial Park. Outline. Background. Vision and Objective. Overview of Petro Rabigh . Geographical Location and Site. Advantages. Opportunities. Offerings Conditions. Background . Saudi Aramco A fully-integrated, global petroleum enterprise . Sumitomo Chemical
E N D
Outline Background Vision and Objective Overview of Petro Rabigh Geographical Location and Site Advantages Opportunities Offerings Conditions
Background • Saudi Aramco • A fully-integrated, global petroleum enterprise. • Sumitomo Chemical • One of the Sumitomo group company, and also one of Japan's leading chemical manufacturers, offering a diverse range of products in worldwide.
Vision Establishing an industrial park to convert petrochemical further into downstream product with an integrated network of feedstock suppliers, infrastructure and service providers. Create more “Value” in Saudi Arabia Job, Skill, Future Business Opportunity
Objective Enhanced local economy with a variety of industries and services A platform for broad downstream industries Attraction of Local & foreign investments for High Value Added & Export Oriented industries Creation Job opportunities for local society
Existing Refinery Naphtha CDU Crude Kerosene 400,000 BPD Fuel Oil Refinery Upgrade VDU VGOHDT Gasoline(63 MBD) HOFCC C4 Alky&Isom Fuel Oil(89 MBD) LL Density polyethylene LLDPE 250 KTA LL Density polyethylene LLDPE 350 KTA Petrochemicals High Density Polyethylene HDPE 300 KTA Ethylene Glycol MEG Ethane Cracker 600 KTA Ethylene 1,300 KTA Ethane Polypropylene - Homo 350 KTA PP (Homo) 95 MMSCFD Polypropylene – ICP PP (Block) 350 KTA Propylene Oxide PO 200 KTA Propylene900 KTA Petro RabighProcess Configuration Utilities & Offsites Water、Steam, PowerCooling Water Potable Water Compressed AirTankageFlare SystemsMarine Loading Misc. Projects Pipelines Buildings Communications
Saudi current and planned rail network Geographical Location • In the same site with Petro Rabigh • Saudi Arabia is already well connected by extensive road network. RCIP is within 7 Km from the highway. • 150 Km to KAI Airport in Jeddah • 180 Km to Jeddah Islamic Port, World 28th (in 2004) and Saudi Arabia largest container Port. handle 39 MM ton (exclude crude oil) and exports to 66 countries worldwide and still growing rapidly • 20 Km to King Abdullah Economic City as an access to a possible future seaport and other facilities. • Rail transport may be a good option from East to west by 2012…Expansion underway • North-South expected for 2010 • Land bridge expected for 2012-2014 • 170 Km from Yanbu Industrial City
GeographicalCondition N W PETRORabigh King Abdullah Economic City and its Sea Port Rabigh Town
RCIP Site • In the same site with Petro Rabigh • RCIP occupy's 240 ha (2,400,000 m2) • RCIP is Isolated from Petro Rabigh with Property Fence and has its own entrance connected to the highway • RCIP is divided in to 5 Zones to accommodate around 30-40 Medium / Small industries. • Zone I – Industrial Services • Zone II - Plastic Processing • Zone III - Assembling • Zone IV - High-Tech • Zone V - Logistic and Utility • RCIP site is equipped with high standard utilities and infrastructure network, i.e. power , desalinated water , sewage and communication networks. Rabigh Conversion Industrial Park Petro Rabigh Complex
Rabigh Plus Tech Park • Rabigh Plus Tech Park construction is based on the highest International standards including:- • Buildings • Administration Building, 643 SM • Cafeteria building, 461 SM • Support service building, 461 SM. • Maintenance building, 461 SM • Substation Building, 622 SM. • Massjed, 162 SM to accommodate 90 persons. • Guard house, 26 SM
Rabigh Plus Tech Park • Roads and Parking areas • Total length of roads at park is around 15KM with 5 categories as follows: • Primary road: 3.6 KM length, with 35 M width • Secondary road: 2.9 KM length, with 25 M width • Collector road: 3.9 KM length, with 20 M width • Patrol road: 4 KM length, with 4 M width. • Side walk: 25 KM length with 2 M width around park Site
Rabigh Plus Tech Park • Sanitary networks • Total length of sanitary net work around 9 KM with 3 lifting station, 89 Sewer manholes and 89 inspection chamber box. • Storm Water drainage • Total length of storm water drainage around 8.4 KM including 4 concrete culvert box. • Water networks • Desalinated water net works for RCIP site is around 14.5 KM. The raw water is provided by Petro Rabigh at 300 CM per HR through 12” pipe line with total length 5.6 KM.
Rabigh Plus Tech Park • Electrical networks • Total length of electrical cable network is around 39 KM Providing power to site at 13.8 KV. The network will include 4 transformers, 4 switchgears and 48 RMU. • The Power is provided by Petro Rabigh to the park site through 29 KM of Electrical Cable at 34.5 KV. • Communication net works • Total length of primary communication net works is around 35 KM and secondary network is around 13.6 KM with 13 communication manhole, 10 hand hole, 121 pulling hole and 6 cabinet base. • Landscaping • Landscaping area covers 500 SM with water concrete fountain in the center of the Park.
Supporting Business / Industrial Services Logistic Services ConceptFully Integrated Industrial park Industrial Park Integrated Refinery & Petrochemical Center Utilities Supply At cost High value added / Export oriented industries Refinery Feedstock supply Long term agreements Competitive prices Petrochemical Processing One stop service center Technical support Services (PTC) Outside Park Facilities / Services Training Facilities Commercial Services Hotels & Other Business Services Social Services Urban Amenities & Environment Housing
Identified Opportunities for Plastic Processing OpportunitiesFirst : Selection of Opportunities (Plastic Processing) • Non-Woven Fabrics (Hygienic & Medical) • Geo synthetic Materials • Dry Bulk PE Container Liners • Medical Solution Bottles & Sharp Containers • Woven Fabric for Flat Jumbo Bags • Automobile Small Parts • BOPP Film • HDPE Composite Pipes
Suggested Products by Category OpportunitiesSecond : Selection of Opportunities (Wide Range) 1. Children related -Infant care -Toys -Stationery -Baby stroller -Child seat 2. Automobile parts: - Battery container - Accessories - Replacement parts 3. Tires -Automobile tires 4. Medical & health: -IV solution bag -Supplements -Barrier film -Disposable medical analytical products 5. Water related: -Water purification plant -Membrane -Rigid pipe -Chemical additives 6. Construction -Plastic flooring- Domestic -Wall paper -Water proof sheet 7. Construction -Specialty film- Export (window, construction, agriculture) 8. Household -Household appliancesElectric -Switches, wire and Appliances cables -LCD (long term goal) 9. Paints -Construction paints -Repair paints for automotive -Paint for plastic 10. Others -Plastic in general -Recycling system
Land Lease Rate (for 30 Years) include industrial park management fee (6) SR/sq m/year , to be revised every 5 years Lots are of multiple of 5000 sq m. Utilities Electricity unit Supplied @ 13.8 KV 10 Halalah / Kwh Desalinated Water 4.5 SR / m3 Feedstock from Petro Rabigh at market based competitive prices and through long term supply agreements. Tenants has the option to use feedstock from other than Petro Rabigh Offering Conditions