300 likes | 395 Views
Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule). Contractor Plan of Action (CPOA) Prepared. DOE Plan of Action (POA) Prepared by DOE Line Mgr. AA Reviews and Approves CPOA and POA.
E N D
Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Startup Notification Report Prepared and Submitted Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE TL Pre-Assessment Preparation and Planning (Team Selected Initial Team Mtg Pre-Site Visit, IP Drafted) AA Approves SNR and Nominates DOE Team Leader (TL) Prerequisites met (MSA) Readiness Review Process Begins Contractors RR and Final Report DOE RR IP approved by TL Corrective Action Plan (CAP) Submitted and Approved DOE RR and Final Report CAP Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) Prestart Findings Closed DOE Endorsement of RTP and MSA AA Authorizes Startup AA Authorizes Start of RR to RR TL Readiness ReviewCourse Facility Scoping Meeting – Mod 3 Nov 2006
Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Startup Notification Report Prepared and Submitted Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE TL Pre-Assessment Preparation and Planning (Team Selected Initial Team Mtg Pre-Site Visit, IP Drafted) AA Approves SNR and Nominates DOE Team Leader (TL) Prerequisites met (MSA) Readiness Review Process Begins Contractors RR and Final Report DOE RR IP approved by TL Corrective Action Plan (CAP) Submitted and Approved DOE RR and Final Report CAP Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) Prestart Findings Closed DOE Endorsement of RTP and MSA AA Authorizes Startup AA Authorizes Start of RR to RR TL Readiness Review Process 1 Year Prior to RR Nov 2006
Learning Objectives • An understanding of the importance and purpose of a pre-planning or scoping meeting • Project Management, DOE O 413.3A, M 413.3-1 • Facility Preparation, Planning, Timing, Verification • Understand the AA Selection • Identify Prerequisites Nov 2006
Project Management DOE O 413.3A, M 413.3-1 • Define the work scope . . . • Construction, modification, support SSCs . . . • Equipment testing and subsequent repairs . . . • Documentation development-DSA, procedures, etc. . . • Training, qualification, surrogate operations . . . • Identify task relationships . . . • Predecessor: Procedures . . . • Successor: Operator Training . . . • Plan realistic task duration . . . Essential! • When changes occur, identify all affected tasks . . . Nov 2006
Facility Prep and Planning • Engineered controls in place and tested; • Procedures complete, V&V, CM; • Training complete; • Surveillances demonstrated and current; • Management programs in place: • Specific Administrative controls implemented and verified effective. • Issues and other Tracking systems functioning. Nov 2006
Plan to Achieve Readiness • Identify and address Core Requirements early in the schedule: • Prerequisites! • Allow time for implementation: • Training . . . • Procedure V&V . . . • Practice . . . • Can’t Start Too Early! Nov 2006
The Authorization Authority (AA) • DOE Management Official (or Designee) who approves the: • SNR, • CPOA, POA, CAPs, • Appointment of the DOE Team Leader, • Endorsement of Readiness to Proceed, • The startup or restart of a facility. (DOE O 425.1C) Nov 2006
DOE-STD-3006-2000Table 1 – Startup and Restart Requirements Summary Nov 2006
Determination of AA DOE O 425.1C Requirements Nov 2006
Identify Prerequisites • Part of Project Planning – Measurable Milestones • Detailed and Measurable . . . • Tied to Core Requirements - are they met? • Documented in CPOA, POA and IPs Nov 2006
Identify Prerequisites (continued) • Specific Startup Requirements: • Identify ALL SSCs including support systems; • Authorization and Safety Basis; • Operator Training Requirements Completed; • Procedures Finalized (V&V); • Test Program Complete, results approved; • DSA fully implemented; etc; . . . Nov 2006
Authorization Agreement Authorization Basis (AB) S/RID EIS SER Safety Basis (SB) ORR/RA DSA (or equivalent) TSR, HAR, FHA, BIO, USQ NESS Defined Work Scope Special Terms & Conditions WSS PHA Environmental Permits Drawings (facility, tooling, etc.) Technical Manuals Engineering Calculation Notes Contractor Safety Programs Site S&S Plan Emergency Preparedness Plan Identify Prerequisites(continued) Nov 2006
Planning for Failure Nov 2006
Questions Nov 2006
Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Startup Notification Report Prepared and Submitted Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE TL Pre-Assessment Preparation and Planning (Team Selected Initial Team Mtg Pre-Site Visit, IP Drafted) AA Approves SNR and Nominates DOE Team Leader (TL) Prerequisites met (MSA) Readiness Review Process Begins Contractors RR and Final Report DOE RR IP approved by TL Corrective Action Plan (CAP) Submitted and Approved DOE RR and Final Report CAP Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) Prestart Findings Closed DOE Endorsement of RTP and MSA AA Authorizes Startup AA Authorizes Start of RR to RR TL Readiness ReviewCourse Facility Scoping Meeting – Mod 3 Nov 2006
Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Startup Notification Report Prepared and Submitted Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE TL Pre-Assessment Preparation and Planning (Team Selected Initial Team Mtg Pre-Site Visit, IP Drafted) AA Approves SNR and Nominates DOE Team Leader (TL) Prerequisites met (MSA) Readiness Review Process Begins Contractors RR and Final Report DOE RR IP approved by TL Corrective Action Plan (CAP) Submitted and Approved DOE RR and Final Report CAP Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) Prestart Findings Closed DOE Endorsement of RTP and MSA AA Authorizes Startup AA Authorizes Start of RR to RR TL Readiness Review Process 1 Year Prior to RR Nov 2006
Learning Objectives • An understanding of the importance and purpose of a pre-planning or scoping meeting • Project Management, DOE O 413.3A, M 413.3-1 • Facility Preparation, Planning, Timing, Verification • Understand the AA Selection • Identify Prerequisites Nov 2006
Project Management DOE O 413.3A, M 413.3-1 • Define the work scope . . . • Construction, modification, support SSCs . . . • Equipment testing and subsequent repairs . . . • Documentation development-DSA, procedures, etc. . . • Training, qualification, surrogate operations . . . • Identify task relationships . . . • Predecessor: Procedures . . . • Successor: Operator Training . . . • Plan realistic task duration . . . Essential! • When changes occur, identify all affected tasks . . . Nov 2006
Facility Prep and Planning • Engineered controls in place and tested; • Procedures complete, V&V, CM; • Training complete; • Surveillances demonstrated and current; • Management programs in place: • Specific Administrative controls implemented and verified effective. • Issues and other Tracking systems functioning. Nov 2006
Plan to Achieve Readiness • Identify and address Core Requirements early in the schedule: • Prerequisites! • Allow time for implementation: • Training . . . • Procedure V&V . . . • Practice . . . • Can’t Start Too Early! Nov 2006
The Authorization Authority (AA) • DOE Management Official (or Designee) who approves the: • SNR, • CPOA, POA, CAPs, • Appointment of the DOE Team Leader, • Endorsement of Readiness to Proceed, • The startup or restart of a facility. (DOE O 425.1C) Nov 2006
DOE-STD-3006-2000Table 1 – Startup and Restart Requirements Summary Nov 2006
Determination of AA DOE O 425.1C Requirements Nov 2006
Identify Prerequisites • Part of Project Planning – Measurable Milestones • Detailed and Measurable . . . • Tied to Core Requirements - are they met? • Documented in CPOA, POA and IPs Nov 2006
Identify Prerequisites (continued) • Specific Startup Requirements: • Identify ALL SSCs including support systems; • Authorization and Safety Basis; • Operator Training Requirements Completed; • Procedures Finalized (V&V); • Test Program Complete, results approved; • DSA fully implemented; etc; . . . Nov 2006
Authorization Agreement Authorization Basis (AB) S/RID EIS SER Safety Basis (SB) ORR/RA DSA (or equivalent) TSR, HAR, FHA, BIO, USQ NESS Defined Work Scope Special Terms & Conditions WSS PHA Environmental Permits Drawings (facility, tooling, etc.) Technical Manuals Engineering Calculation Notes Contractor Safety Programs Site S&S Plan Emergency Preparedness Plan Identify Prerequisites(continued) Nov 2006
Planning for Failure Nov 2006
Questions Nov 2006