1 / 19

PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)

PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014). Batch Processing Modelling (Equipment Rating and Economic Evaluation). Student should be able to; . EVALUATE the processing after rating the equipments ESTIMATE economic data of bioprocess plant. Course outline.

galen
Download Presentation

PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PTT303 /2 PROCESS MODELLING AND SIMULATIONSEM 1 (2013/2014) Batch Processing Modelling (Equipment Rating and Economic Evaluation)

  2. Student should be able to; EVALUATE the processing after rating the equipments ESTIMATE economic data of bioprocess plant

  3. Course outline • Equipment rating • Economic evaluation of a flowsheet • Engineering economic review • Cost factors • Generating Economic Reports • Strategies for increasing profits

  4. Equipment rating • Design mode vs. rating mode

  5. Equipment sizing vs. rating • Sizing- calculate the dimensions of an equipment for a fixed operating condition • Rating- calculate the percentage of use of an equipment with fixed dimensions • Default setting in SPD: • Design Mode (sizing) when equipment dimensions are not specified, e.g. reactor volume, filter area, etc. • In Design Mode, a max available size for the equipment is specified. If the calculated equipment size > max allowable size, SPD will employ multiple pieces of equipment (with each equipment size < max allowable size.)

  6. Filter (PFF-1) sizing • Right click your PFF, choose “Equipment Data” to check on the calculated filter area • Remember that: Flux =Vol/(Area x time) • Data needed: • Flux & time (revisit by right click PFF Operation Data/ FILTER-1 • Feed volume determined by SPD from P-1 (reactor) • Hence, SPD calculates filter area Calculated filter area = 1.5 m2 Design mode Max available size = 80 m2

  7. Rating • If Rating Mode is selected, the size & number of the units can be specified SPD takes this info to calculate the output of simulation, e.g. M&E balances, process time, etc. • Task: switch the PFF sizing method to Rating Mode ( right click PFF/ Equipment Data) & do the following changes: • Filter size = 2 m2 (1unit) • Filter flux = 150 L/m2hr (revisit by right click PFF Operation Data/ FILTER-1, Duration, Filtration Time) • Save your tutorial as different file name

  8. Working session Determine the filtration time when PFF is switched to Rating Mode

  9. Economic evaluation • Stream classification • Economic evaluation features

  10. Stream classification • We need to classify all input and output streams as raw materials, revenues or wastes (solid, liquid or gaseous) & supply their cost data before we perform the throughput analysis, plant economic evaluation & environmental impact assessment calculations. • By default, SPD estimates a purchase or selling price for a stream based on the price of each component and the composition of the stream.

  11. Stream classification • Output streams: • Classification: • “C” = Revenue • “Emission” = Emission • “B + Heptane” & “Wash out” = Aqueous Waste • Cost: • Emission and aqueous waste disposal cost = $0.10/kg (click “Set by user” first) • Revenue stream (automatically calculated based on stream composition) Path: Tasks/Stream Classification • Main Product Rate: • Stream “C” • Reported based on “single component C” Pre-inserted cost data

  12. Cost broken down into: Capital cost Equipment cost Building costs Operating cost Utilities Labor Raw material Index of economic performance Return on Investment (ROI) Annual Income/ Capital costs *100% Usually aim for 30% Internal Rate of Return (IRR) Discounted Cash Flow Payback Period/Time Amount of time to repay automatically Usually aim for 7 years or less Net Present Value (PVV) Value of project in current year currency Engineering economic review

  13. Cost factors (operation level) • For each unit procedure you can set cost data for each operation under “Labor, etc.” tab • Path: Right click an equipment procedure/ Operation Data/(any operation) Create new labors Can only be change in Databanks/Heat Transfer Agents

  14. Cost factors (equipment level) • Path: Right click an equipment procedure/ Equipment Data/ (any operation) • Purchase Costs • Automatically calculated • Set by user • Adjustments • Change material of construction • Change opening and maintenance costs

  15. Cost factors (section level) • Section- segment or a group of equipment • Capital cost adjustments (piping, instrumentation) • Operation cost adjustments (labour, facilities, QA)

  16. Cost factors (flowsheet level) • Path: • Edit/ Flowsheet Options/ Economic Evaluation Parameters • Right click on Flowsheet Economic Evaluation Parameters • Cater for • Overall Financing • Time Valuation • Income taxes

  17. Economic evaluation • Pre-simulation check: • All streams are classified, especially the main revenue stream • Filter setting: • Rating Mode • Area = 2.0 m2 • Flux = 150 L/m2h • Set under Recipe Scheduling Information • Number of batches • Cycle time = 12hours

  18. Economic evaluation steps • Solve M&E balances • Task/ Perform Economic Calculations • Results: • View/ Executive Summary • Reports/ Economic Evaluation • Reports/ Cash Flow Analysis • Report/ Itemized Cost Report

  19. Strategies to increase profits • Increase number of batches • Try larger batches, e.g. maybe 100? • Let SPD calculate the maximum batches • Debottleneck • Size debottleneck i.e equipment capacity • Time debottleneck i.e higher equipment use • Capital costs will rise with equipment sizes • Operation costs can be optimised with better labor and facility usage