Demolition of Kim Chuan Water Reclamation Plant and Serangoon Sludge Treatment Works and Grouting of Pipelines. Purpose of this project To restore and return the state lands for future development To fill up the voids of abandoned pipelines to prevent their collapse.
E N D
Demolition of Kim Chuan Water Reclamation Plant and Serangoon Sludge Treatment Works and Grouting of Pipelines Purpose of this project • To restore and return the state lands for future development • To fill up the voids of abandoned pipelines to prevent their collapse
Demolition of Kim Chuan Water Reclamation Plant and Serangoon Sludge Treatment Works and Grouting of Pipelines • Project Status • Tender for the Works targeted to be called in Nov 09 • Scope of the Works Demolition of: 1) Kim Chuan Water Reclamation Plant 2) Serangoon Sludge Treatment Works 3) Wash Water Pumping Station Grouting of: 1) Outfalls - 4km of one 1800mm dia, 10km of two 1580mm dia 2) Sludge Mains - 10km of two 457mm dia 3) Pumping Mains - 4km of one 457mm dia
SERANGOON STW WASH WATER PS TECK HOCK PS EFFLUENT OUTFALL PIPES SLUDGE MAINS PUMPING MAIN DEMOLITION SITES KIM CHUAN WRP Demolition of Kim Chuan Water Reclamation Plant and Serangoon Sludge Treatment Works and Grouting of Pipelines