Agenda. News / Status Alice, Marcel Design IIb radiation monitoring system Sijbrand Design IIb temperature monitoring system Marj Proposal for grounding Marvin SVX4 update Len. Schedule.
E N D
Agenda • News / Status Alice, Marcel • Design IIb radiation monitoring system Sijbrand • Design IIb temperature monitoring system Marj • Proposal for grounding Marvin • SVX4 update Len Run IIb Silicon Meeting, November 19, 2002 - A. Bean, M. Demarteau
Schedule • Near term milestones • 1.1.1.1.3 Sensor Probing Equip Setup And CertF. Complete 11/6/02 • Missed • 1.1.3.11.4 Silicon Prototype Mechanical Stave Built Mon 12/16/02 • Major milestone at which point final stave design will be chosen • 1.1.1.2.4 Choose Layer 0/1 sensor technology 2/5/03 • 1.1.1.4.2.2.2 Order outer layer sensors 2/11/03 • Tasks having started / ending this month • 1.1.1.2.1 Develop Layer 0 Masks 11/27/02 • 1.1.2.4.2.3 Testing Layer 2-5 hybrid prototypes 10/27/02 • 1.1.2.16.1.1 Design IB backplane prototype 3/7/03 • 1.1.2.17.1.1 Design Low Voltage System 2/21/03 • 1.1.3.2.7 Engineering prototype L0 support structure 3/10/03 • 1.1.3.3.6 Engineering prototype L1 support structure 3/14/03 • 1.1.3.4 Layer 0 Tooling Fabrication 12/3/02 • 1.1.5.2.1.1 Prototype shells for support cylinders 11/25/02 • 1.1.6.2.1 Design Radiation Monitoring System 11/25/02 • 1.1.7.4.1.1. Modification of 2a Unpacking Code 10/30/02 Run IIb Silicon Meeting, November 19, 2002 - A. Bean, M. Demarteau
News and Status • Schedule • We are lagging in several areas. At the next L3 meeting we would like to address these areas • At the L3 meeting we will also discuss schedule status and effort reporting Run IIb Silicon Meeting, November 19, 2002 - A. Bean, M. Demarteau
Workshop • Date: Dec. 12 and 13 • Workshop: “Moving beyond the Technical Design Proposal” • We are close to making some decisions regarding the final configuration of various detector elements. Moreover, some significant milestones are coming up; we should prepare ourselves for PRR’s and identify any possible shortcomings in our current testing and/or design, ensure a coherent design and provide documentation • Goals: • Full overview of layer 0 and Layer 1 sensor tests, irradiation tests; decide on layer 0 sensor/hybrid configuration • Full review of outer layer sensor probing results • Will try to do sensor discussion together with CDF • Evaluation of stave design • Presentation of design for Low Voltage system • Fully worked out plan for horseshoe area, including infrastructure needs • Plans for junction card area layout and run to horseshoe area Run IIb Silicon Meeting, November 19, 2002 - A. Bean, M. Demarteau