1 / 16

ARGOS-3/4 Pilot Projects Dedicated to Met-Ocean Applications

ARGOS-3/4 Pilot Projects Dedicated to Met-Ocean Applications. ARGOS Instruments in Operations. ARGOS 1. ARGOS 2. ARGOS 4. ARGOS 3. NOAA I Juillet 1993. NOAA J Déc. 1994. NOAA K 05/1998. NOAA L 09/2000. NOAA M 06/2002. NOAA N 05/2005. NOAA N’ 2009. NPOESS C1 01/2013.

Download Presentation

ARGOS-3/4 Pilot Projects Dedicated to Met-Ocean Applications

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARGOS-3/4 Pilot Projects Dedicated to Met-Ocean Applications

  2. ARGOS Instruments in Operations ARGOS 1 ARGOS 2 ARGOS 4 ARGOS 3 NOAA I Juillet 1993 NOAA J Déc. 1994 NOAA K 05/1998 NOAA L 09/2000 NOAA M 06/2002 NOAA N 05/2005 NOAA N’ 2009 NPOESS C1 01/2013 NPOESS C2 12/2015 USA / NOAA ARGOS 3 METOP-A 10/2006 METOP-B 2011 METOP-C 2015 EUROPE / EUMETSAT ARGOS 3 SARAL 2010 INDE / ISRO Satellite Network

  3. Argos-3/4 PP The purpose of creating Argos-3/4 Evaluation Pilot Projects is to • i) independently and objectively evaluate Argos-3 for use by the global Met-Ocean community, • ii) foster Argos-3 integration by manufacturers, and • iii) provide Argos-3 equipped in-situ tools to the community for evaluation (CLS provides SVP and floats)

  4. Argos-3 PP - Drifters • DBCP 2008 in Cap Town, • 4 Manufacturers involved: Clearwater, Pacific, Gyre, Metocean, Marlin Yug, • Buoys produced, tested via satellite and deployed • Hourly Sensor Data collection recovery: > 95%, • About 90% of power supply saving on Tx,

  5. A typical Argos-3 buoy integration

  6. MET – SVP B ID 82276

  7. MET – SVP B ID 82276

  8. Clearwater/ Deployed by IMEDEA Med. Sea - SVP BG 82233 Deployment South of Majorca ClearSat-15-III drifter

  9. Argos-3 SVP BG - ID 82233Argos-2 SVP - ID 94128

  10. Argos-3 performances

  11. Argos-3 PP - Floats • Ifremer / Webb Research and University of Washington already involved • 11 floats will be produced, and deployed • Goals: • High Sensor Data collection recovery performances, • Higher data volume with secure transmissions (handshaking), • Reduction of the surfacing duration,

  12. Approach # 1 Argos-3 satellite pass ACK msg2 ACK msg3 ACK msg1 Go! M1 M2 M3 M4 M5 M6 ……………….. Open session request User message 2 User message 3 User message 1 Tx Transmissions of Low Resolution profile Tr: 50 to 60 sec. (Each message is different) End of transmissions of Low Resolution Profile if needed then transmission of High resolution profile if decided by FA Is there a satellite over-head? 1 sec. Rx: OFF 3 min Rx: ON $ Nolock $ Nolock $ Nolock $ lock $ lock Rx: ON Float Pops-Up

  13. Approach # 1 • Less time on surface (16 msgs, N=3, Tr: 30 sec.)

  14. Approach # 2 • Up to 80 messages Tx • and ACK by satellite 15-minute sat. pass 15-minute sat. pass Rendez-vous in X0 days (optional) Rendez-vous in Y days Rendez-vous in Z days X0 days (setting) Y days Z days Surface Deployment Day: D Parking depth Profiling depth

  15. Approach # 2 • We focus on a surfacing duration • < 30 minutes

  16. Improvements for floats • High performance for collecting hourly sensor acquisitions • Reduction for the surfacing duration • Large reduction of the power consumption allowing Tx of more sensor information in a secured and robust, • Optimization of the transmission leading to a better use of the satellite network and then better performances for users, • Secured Tx (check sum control), • Remote command to potentially change the mission,

More Related