80 likes | 215 Views
WG1 Summary Members Dominique Duchesneau Annecy Thierry Le Flour Annecy Henri Pessard Annecy Giovanni Rosa Rome Mario Spinetti Frascati Gabriele Sirri Bologna Nicola D’Ambrosio LNGS C.S.Yoon Gyeongsang Kazuyama M. Nagoya
E N D
WG1 Summary Members Dominique Duchesneau Annecy Thierry Le Flour Annecy Henri Pessard Annecy Giovanni Rosa Rome Mario Spinetti Frascati Gabriele Sirri Bologna Nicola D’Ambrosio LNGS C.S.Yoon Gyeongsang Kazuyama M. Nagoya Nakamura M.Nagoya Shibuya H. Toho Mikado S. Nihon Hara T. Kobe
Overview of the discussionHeld in JAN 22and 23 • Confirm the flow of the Brick handling • Define the place where the main hardware unit will be set. • Discussion on the Brick storage place • Shielded Area should be equipped with dedicated hardware. • PC, Network, Code-reader • Discussion on the CS detaching place-→ • Two solution: Start from current CSX-ray marking barrack in HallC • Later move to S A after some space gain in SA. • Label printer should be equipped. • Discussion on the scaffolding and brick storage • Depth of the stored brick of one is agreed. • New scaffoldings are needed. • Discussion on the improvements of the Brick X-ray system • Define the temporary storage area for Job decoupling • Define the method for no-miss operation of Brick handling • Discussion on the BMM check points • Discussion on the unified VISUAL LABEL control after extraction. • Presentation of CS x-ray utilization for CS2 and CS1 physical • identification • Under discussion: Use Position of CS-Xrays for Brick-CS Association . • Joint WG with WG3 • Discussion on the MISTAKE? occurred in the last RUN. • Discussion on the method and procedure of scan results feedback to • Brick Handling • 23 Define the Job units for Shifts • Estimation of the manpower needed.(Joint WG with WG2) • Summary of this WG1 and check the Home work for next WG.