100 likes | 396 Views
Capability Maturity Model (CMM). http://www.sei.cmu.edu/cmm/cmm.html. 5 Levels of Maturity. Level 1 – Ad Hoc, unpredictable, high risk (70%) Level 2 – Repeatable from project to project (15%) Level 3 – Defined – better performance (<10%) Level 4 – Very predictable, sign.improvement
E N D
Capability Maturity Model (CMM) • http://www.sei.cmu.edu/cmm/cmm.html
5 Levels of Maturity • Level 1 – Ad Hoc, unpredictable, high risk (70%) • Level 2 – Repeatable from project to project (15%) • Level 3 – Defined – better performance (<10%) • Level 4 – Very predictable, sign.improvement in one dimension (<5%) • Level 5 – Significant improvement across all dimensions (<1%)
CMM Questionaire • http://www.sei.cmu.edu/pub/documents/94.reports/pdf/sr07.94.pdf • A set of questions to find out what level of maturity your company is at.
CMM • At what level is most of the industry ? • What is the minimum level where you see some kind of repeatable performance from project ot project ? • At what level do you see significant improvement across all dimensions ?
Frequent Misconceptions • Compliance with CMM standards doesn’t guarantee a good product or vice-versa. • A mature process does not cost more money
Specific CMM requirements • Systems Security Engineer – CMM http://www.sse-cmm.org/metric/metric.htm