An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EFCA D&S16 January 2006 Mario Marti Secretary General usic

  2. usic • Swiss Association of Consulting Engineers • 800 member firms (including 380 branches) • approx. 7‘000 employees • gross turn-over approx. CHF 965 Mio. p.a.

  3. Why a Research Study? • 1994 Entry into force of the Federal Statute on Public Procurement (BoeB) • complaints by member firms on the increase in costs for the preparation of the offers • 2003: First internal study by usic calculating the costs connected with the public tendering procedure.

  4. An Example • value of contract (fee): EUR 200’000 • monetary return due to competition: EUR 30’000 • 8 engineering firms participate: each one of them spends EUR 10’000 for preparing the offer, total of EUR 80’000 • costs of public authority (publication, evaluation etc.): EUR 20’000 • Overall macroeconomic cost: EUR 100’000 • Conclusion: to save EUR 30’000 we spend EUR 100’000

  5. The Study • 67 public procurement proceedings, including the costs of: • 67 contracting authorities • 70 usic member firms participating in these proceedings (extrapolation for the rest)

  6. Volkswirtschaftliche Kosten bei öffentlichen Ausschreibungen von Planeraufträgen Projektleitung: Prof. Dr. Franz JaegerOrdinarius für Wirtschaftspolitik an der Universität St. Gallen und geschäftsführender Direktor des Forschungsinstituts für Empirische Ökonomie und Wirtschaftspolitik an der Universität St. Gallen (FEW-HSG) Projektbearbeitung: lic. oec. HSG Thomas Höppli lic. oec. HSG Oliver Atzenweiler

  7. Public Procurement:Definitions Public procurement above the statutory thresholds: • open procedure • selective/restricted procedure Public procurement below the statutory thresholds: • invitation/negotiated procedure • direct contract

  8. Benefits and Costs of Competition < Cost of Competition = Benefits of Competition > redundant competition offenes/selektives Verfahren S* = optimal treshold redundant competition Efficient competition

  9. Result 1: Quelle: FEW-HSG

  10. Result 2: Current treshold according to BoeB Quelle: FEW-HSG

  11. Result 3: Quelle: FEW-HSG

  12. optimal treshold for variable benefit aktueller Schwellenwert Ideal Treshold Optimaler Schwellenwert Quelle: FEW-HSG

  13. Conclusions • economic costs of public procurement are considerable • particularly for small contracts the costs can be disproportionately high in comparison to the contract size • the costs are lower under the invitation/negotiated procedure than under the open or restricted procedure • public awarder equally bears high costs in comparing and evaluating the bids • Depending on the assumptions of the monetary benefit attributed to the competition, the threshold for intellectual services should be set between EUR 400’000 and 580’000 from a macroeconomic viewpoint. • With the current threshold of approx. EUR 166’000, the competitive bid would need to generate a monetary return of approximately 52% of the contract size

  14. Political Conclusions for usic (Switzerland) • National legislation should completely capitalize on the international thresholds (no lower national thresholds). • The threshold should be respected in both ways by the authorities (no open procedure for contracts below threshold). for Efca/Fidic (WTO) • The internationally set threshold should be increased for services (WTO treaty negotiations). • Lobbying activities (EU authorities and national governments).

  15. Documents • Factsheet (summary in English) • Factsheet (German, French) • Full Text Version (German only): www.usic.ch