An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Community Build-Out Analysis New techniques - for an old friend Nov 5, 2007 Kevin Behm – Addison County Regional Planning Commission

  2. Community Build-Out Analysis • Development started in 1999 as a part of the Community Planning Tools Demonstration Project funded by Sen. Leahy’s Office and administered by the Center for Rural Studies at UVM. • Center for Rural Studies has provided additional funding to improve the program over the past 6 years. The Vermont Agency of Transportation assisted in this version. • Operates as an extension to the ESRI GIS program ArcView 3.2 • Public funding – the program is free, but support is limited

  3. Community Build-Out Analysis • The current version (v2.0) and a detailed manual are available as a download from The Center for Rural Studies at UVM. http://crs.uvm.edu/cpdp/buildout • A new version (v.3.0) with innovative techniques is in beta testing and will be available soon. • The new features include: • Mixed use zoning districts and mixed res/com buildings • Open-space zoning concepts • User defined timelines for build out scenarios • Population projections using trend analysis • User defined compact areas for development ‘seeds’

  4. What is a Build-Out? • A build-out analysis predicts the maximum potential for development based on town policies and zoning bylaws as well as environmental or geographic constraints to development. • WHY? A planning tool to assess the consequences of existing and proposed planning and zoning practices.

  5. 1869 1942

  6. 1962 1977

  7. 1992 1995

  8. Existing zoning

  9. Build-out under existing zoning • Existing residential – 611 • Potential development with no development in wetlands, floodplain, or forest districts - 3263

  10. DRAFT zoning • Low density district changed from 5 acre to 10 acre • Forest District changed to Conservation to include hilltops and steep slopes

  11. Build-out under draft zoning • Potential residential development – 1546 • vs. current zoning of 3263 units

  12. Build-Out Status All parcel/zoning combinations are symbolized with a build-out result No existing house and under the minimum lot size ( 1 unit added) Under the minimum lot size Density removed using a layer Density allowed but houses must be relocated off of layer Density reduced using a layer and fewer houses shown

  13. Compare build-out results - spatial • Existing zoning • Draft zoning • Development density changes • Polygon symbology changes

  14. Methodology – Com/Industrial Village/ Commercial Area Min Lot Size .33 ac (14,520 sq ft) Lot Coverage 75% Max Building Hgt 35 ft Sq Ft / Parking Sp 200 Existing Development

  15. Resulting Summary Table by Zone

  16. Compare build-out results – export to spreadsheet • Existing zoning • Draft zoning • Existing zoning residential units – 3263 • Draft zoning Residential units –1546

  17. Methodology – Data Needs • Uses existing town GIS data Zoning Tax Parcels Existing Development Points • Residential • Commercial • Industrial • Public Service Excluded parcel points • Natural Resource Information • Data must be current or updated for accuracy

  18. Methodology – Basic Steps • Construct a table of each parcel’s acreage by zoning district • Determine existing parcels that are fully developed • Calculate potential new development allowed in each zone

  19. Methodology – Next Level Change minimum lot size of ASRR district to 5 acres from 10 acres

  20. Methodology – Compare Tables Potential units in the ASRR district increase from 181 to 617

  21. Methodology – Operations • Build out operations on multiple layers • Removal of development potential • Reduction of potential • Increase development potential • A road frontage-based build out is also possible with a properly prepared road file

  22. Mixed use zoning districts and mixed res/com buildings

  23. Open-space zoning concepts

  24. Open-space zoning concepts Density-based or Set-Aside with bonus • Density – based example60 acre parcel in a 1 house/5 acre maximum density districtTypically provides for 12 houses on 5-acre lotsWith a minimum lot size of 2 acres –12 homes can be placed on as little as 24 acres Leaving up to 36 acres open on this parcel

  25. Open-space zoning concepts Tracking open-space acres

  26. Time – based scenario requirements Supply – Demand model • Maximum build out is available supply • Population projection is the demand over a certain time frame. • Population is divided into households and per household estimates of commercial and industrial land use are used. (these estimates are set by the user) Spatial allocation of growth • Where is growth likely in the community – mixed use areas vs. scattered development • Placement of residential and commercial uses in a mixed use zone is determined by locations of existing development

  27. Identify mixed-use areas as possible ‘seeds’ for future growth • Using Herfindal-Hirschman Index (HHI) – Daniel Rodriguez, Univ of North Carolina • Sum of each land use proportion squared • 100% Res HHI = 1002 = 10,000 • 50% Res, 50% Com HHI = 502 +502 = 5,000 • 50% Res, 25% Com, 25% Ind HHI = 502 +252 +252 = 3750 • Establish a neighborhood around existing development and calculate

  28. Identify mixed-use areas as possible ‘seeds’ for future growth • Review each land use proportion in the neighborhood

  29. Identify mixed-use areas as possible ‘seeds’ for future growth • Transfer HHI and percentages to parcels • Query build out parameters to identify ‘compact areas’

  30. Population Projections Establish base year, interval and final year Enter historic data for base period Calculate population projections using trend extrapolation techniques

  31. Review and Select Projection Statistics are provided for evaluation MAPE – Maximum Absolute Percent Error CRV – Coefficient of Relative Variation Mean Error

  32. Compare results – export to spreadsheet

  33. Time slice growth allocation • Primary growth allocation via compact area vs. scattered Compact • If there are multiple compact areas allocation is in order of density • Parcels adjacent and within each compact area are queryed for the highest density differential (ie. vacant parcels adjacent to fully developed parcels developed first) • Parcels selected for development based on best-fit of the number of units Scattered (Town-wide) • Random choice of parcels including those in compact areas

  34. Time scenario results by time slice Parcels are built out completely so extra units must be carried over to the next time period • Household units with HH units carried over to next time slice. • Commercial units with commercial sq ft carried over. • Industrial units with commercial sq ft carried over.

  35. Time slice growth allocation • 75% Compact • 50% Compact • 50% Town-wide • 100% Town-wide

  36. Next Steps for CBOA • Continue to use the program with communities. • Work to improve the currency/accuracy of town data. • Improve the program with new ideas from users. • Issues – move to ArcGIS or Open-Source • Web-based? • Funding partner? – please call.

  37. Acknowledgements Thanks to the Vermont USDA and Senator Leahy’s staff for originally supporting the Community Planning Tools Demonstration Project and to the Center for Rural Studies at UVM and the Vermont Agency of Transportation for providing development support. In addition, we want to recognize the important land use decisions that are made by the volunteer boards and commissions in each of our communities. We sincerely hope that these tools will be an asset to their efforts.