280 likes | 377 Views
TDT4290 Customer-driven project (Kundestyrt prosjekt). Introduction to students Jon Atle Gulla, professor Reidar Conradi, professor Geir Solskinnsbakk, coordinator. Agenda. Background Projects Main and assistant supervisors Course details Allocation of students to groups/projects
E N D
TDT4290 Customer-driven project(Kundestyrt prosjekt) Introduction to students Jon Atle Gulla, professor Reidar Conradi, professor Geir Solskinnsbakk, coordinator
Agenda • Background • Projects • Main and assistant supervisors • Course details • Allocation of students to groups/projects • Client meeting today • Meeting with supervisors tomorrow • Important dates (seminars, lectures, etc.) • Tips
Background • Real project with real customers! • Give the students more practical experience with running all phases of large customer-driven IS/IT projects • Emphasis on the early phases, i.e. project planning, feasibility studies, requirements engineering • Projects vary in scope and focus • Some projects have more emphasis on later phases • Project plan must reflect the particular scope/focus of your project • All work has to be done properly
Practical Information about the Course • “Infoheftet” • A booklet with all relevant information about the course • Students need to be familiar with its content • TDT4290 homepage • Updated information about guest lectures, seminars, student deliverables and presentation, etc. • Must be consulted on a regular basis
Agenda for Today • 9:00-11:45: Introduction to customer driven project for supervisors and customers. Room: G-144 in the "Elektro" building (map). • 11:45-12:15: Lunch for supervisors and customers. • 12:15-14:00: Introduction to customer driven project for students. The students will be organized into groups and introduced to their customers. Location: EL3 • 14:15-16:00: First customer meeting. The students get to know their customer and the details of the assignment.
Supervisors • Every group is allocated one main supervisor and one assistant supervisor • Supervisors’ responsibilities: • Coaching • Project progression • Correction and crisis management • Verification of documents produced • Weekly meetings between student group and supervisors
Main Supervisors • Jon Atle Gulla jag@idi.ntnu.no tel 73591847 • Reidar Conradi conradi@idi.ntnu.no tel 73593444 • Geir Solskinnsbakk geirsols@idi.ntnu.no tel 73594218 • Gustav Aagesen gustava@idi.ntnu.no tel 73594427 • Shang Gao shanggao@idi.ntnu.no tel 73550241 • Sundar Gopalakrishnansundar@idi.ntnu.no tel 73550241
Assistant Supervisors • Hong Guo guohong@idi.ntnu.no • Stig Henriksen stighe@stud.ntnu.no • Basit A. Kahn basit@idi.ntnu.no • Bian Wu bian@idi.ntnu.no • Meng Zhu zhumeng@idi.ntnu.no
Overall Course Plan Date Time Activity Location 26/08 12:15-16:00 Kick-off (M) EL3 27/08 12:15-16:00 First supervisor meeting(M) See above 28/08 12:15-16:00 Seminar in group dynamics (M) – 1 S2 2/09 14:15-16:00 Scrum introduction S7 5/9 09:15-16:00 Seminar in group dynamics (M) – 2 K4, Nidarø 16/09 14:15-16:00 Requirements analysis, Bearing Point S7 23/09 14:15-16:00 IT-architecture, Einar Landre - Statoil S7 30/09 14:15-16:00 Use-case estimation S7 2/10 14:15-18:00 Seminar in technical writing (M) TBA 11/11 14:15-17:00 Course in presentation technique S7 20/11 09:15-16:00 Final project presentation (M) TBA
Student Allocation • Verification of student list • Siv.ing. students • International students • International Master in Information Systems • ERASMUS students • Students allocated to groups of 6-7 students • Groups allocated to projects • Spreadsheet…
15 MINUTES BREAK Unallocated students come forward
Project Groups Groups, students, supervisors and customers
Group 1, eSporing • Main supervisor: Geir Solskinnsbakk, geirsols@idi.ntnu.no • Assistant supervisor: Basit A. Kahn, basit@idi.ntnu.no • Students:
Group 2, Extend • Main supervisor: Sundar Gopalakrishnan, sundar@idi.ntnu.no • Assistant supervisor: Bian Wu, bian@idi.ntnu.no • Students:
Group 3, Fundator • Main supervisor: Shang Gao, shanggao@idi.ntnu.no • Assistant supervisor: Basit A. Kahn, basit@idi.ntnu.no • Students:
Group 4, Telenor R&I • Main supervisor: Reidar Conradi, conradi@idi.ntnu.no • Assistant supervisor: Hong Guo, guohong@idi.ntnu.no • Students:
Group 5, Rolls-Royce Marine AS • Main supervisor: Gustav Aagesen, gustava@idi.ntnu.noAssistant supervisor: Hong Guo, guohong@idi.ntnu.no • Students:
Group 6, Signicat AS • Main supervisor: Reidar Conradi, conradi@idi.ntnu.no • Assistant supervisor: Meng Zhu, zhumeng@idi.ntnu.no • Students:
Group 7, Sintef Fisheries and Agriculture • Main supervisor: Sundar Gopalakrishnan, sundar@idi.ntnu.no • Assistant supervisor:Basit A. Kahn, basit@idi.ntnu.no • Students:
Group 8, Tekna • Main supervisor: Jon Atle Gulla, jag@idi.ntnu.no • Assistant supervisor: Stig Henriksen, stighe@stud.ntnu.no • Students:
Group 9, Telenor R&I • Main supervisor: Sundar Gopalakrishnan, sundar@idi.ntnu.no • Assistant supervisor: Stig Henriksenstighe@stud.ntnu.no • Students:
Group 10, Tieto Enator AS • Main supervisor: Geir Solskinnsbakk, geirsols@idi.ntnu.no • Assistant supervisor: Bian Wu, bian@idi.ntnu.no • Students:
Group 11, Trådløse Trondheim • Main supervisor: Gustav Aagesen, gustava@idi.ntnu.no • Assistant supervisor: Meng Zhu, zhumeng@idi.ntnu.no • Students:
Group 12, NTNU University Library • Main supervisor: Jon Atle Gulla, jag@idi.ntnu.no • Assistant supervisor: Basit A. Kahn, basit@idi.ntnu.no • Students:
Customer Meetings Today Customer meeting kl 14.15 – 16.00
First Meeting with Supervisors The first supervisor meeting for each group is on 27th August. The following table shows the time and place for these meetings. Note that Group 4 Telenor R&I and Group 6 Signicat AS will have their first supervisor meeting 28th of August. Group 4 is scheduled at 8:15 and Group 6 is scheduled at 9:15 (room IT242 for both meetings).
Good luck! TDT4290 Customer-driven project Jon Atle Gulla, professor Reidar Conradi, professor Geir Solskinnsbakk, coordinator