1 / 3

DEOT (DIRECT END OFFICE TRUNKING) TEMPLATE

DISCLAIMER: all routing should follow LERG routing guidelines. SPOP diagrams are valid for 6 months from date of approval; implementation must occur within that time frame. DEOT (DIRECT END OFFICE TRUNKING) TEMPLATE. CUSTOMER NAME and ACNA. CenturyLink EO CLLI.

garron
Download Presentation

DEOT (DIRECT END OFFICE TRUNKING) TEMPLATE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DISCLAIMER: all routing should follow LERG routing guidelines. SPOP diagrams are valid for 6 months from date of approval; implementation must occur within that time frame. DEOT (DIRECT END OFFICE TRUNKING) TEMPLATE CUSTOMER NAME and ACNA CenturyLink EO CLLI If Existing POI/ACTL CLLI – Identify the POI/ACTL CLLI If Need New POI/ACTL CLLI – Identify City Name for the POI/ACTL CLLI CenturyLink EO CLLI LERG CLLI CenturyLink EO CLLI Overflow Tandem CLLI CenturyLink EO CLLI REV 7/21/09

  2. DISCLAIMER: all routing should follow LERG routing guidelines. SPOP diagrams are valid for 6 months from date of approval; implementation must occur within that time frame. DEOT TrunkingInstructions WARNING – SLRN may be in affect on your local trunk groups - Conversion to SPOP may result in traffic pattern changes • List the customer name and ACNA on the DEOT diagram • Fill in the rectangle with the LERG CLLI • Fill in a CenturyLink end office CLLI in a circle for each DEOT trunk group • Connect the POI/ACTL rectangle and circle with a line and describe the trunk group in a text box. Ex. 2w PH 24 trks (26code if available or “NEW”) • If a DEOT is Primary High, traffic overflow must be indicated on the diagram (typically overflow goes to the local or access tandem the DEOT subtends). • Indicate the overflow trunk group on the diagram by connecting the POI/ACTL rectangle and hexagon with a line and describe the trunk group as above • Associate DEOT’s by the tandem they overflow to i.e. all DEOT’s in area served by local tandem on one page, all DEOT’s overflowing to access tandem on separate page • For each access or local tandem to which traffic will overflow, copy page one and indicate the CenturyLink tandem CLLI in the hexagon and the DEOT CLLI(s) in the circles. Use the LATA maps to assist you in determining which offices subtend which tandem. REV 2/05/09

  3. DISCLAIMER: all routing should follow LERG routing guidelines. SPOP diagrams are valid for 6 months from date of approval; implementation must occur within that time frame. DEOT (DIRECT END OFFICE TRUNKING) TEMPLATE CUSTOMER NAME and ACNA ABC Telecom ABC BRTHCOMADS0 2W PH 24 TRKS AE987654 DNVRCOMAHGA FTCLCOHMDS0 2W PH 24 TRKS NEW GRVGCO27DS0 CenturyLink EO CLLI 2W AF 72 TRKS AE576849 FTCLCOMA00T CenturyLink EO CLLI REV 2/05/07

More Related