1 / 30

Spokane County Wastewater Toxics Monitoring – Year One

Spokane County Wastewater Toxics Monitoring – Year One. April 24, 2013 | DRAFT. Agenda. NPDES permit requirements Sampling locations & methods Results Next steps (draft) Draft Action submitted to Ecology on 4/15/2013. Spokane Area – Sewer Service.

garron
Download Presentation

Spokane County Wastewater Toxics Monitoring – Year One

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spokane County Wastewater Toxics Monitoring – Year One April 24, 2013 | DRAFT

  2. Agenda • NPDES permit requirements • Sampling locations & methods • Results • Next steps (draft) • Draft Action submitted to Ecology on 4/15/2013 Brown and Caldwell | DRAFT

  3. Spokane Area – Sewer Service City of Spokane Riverside Park Water Reclamation Facility ▲ N North Spokane ... serves North Spokane Spokane Valley Spokane County Regional Water Reclamation Facility Downtown Spokane ... serves Spokane Valley Brown and Caldwell | DRAFT

  4. NPDES Permit Special Conditions • S2 requires monitoring of Spokane County Regional Water Reclamation Facility (SCRWRF) influent and effluent Brown and Caldwell | DRAFT

  5. NPDES Special Permit Conditions (cont’d) • S9 requires preparation of a Quality Assurance Project Plan (QAPP) • S12 requires development of a plan with a goal of reducing to the maximum extent practicable PCB loads in the County’s wastewater collection system • Influent sample results are needed to help identify PCB sources Brown and Caldwell | DRAFT

  6. Sampling Locations – Year One North Valley Interceptor Sampling Location EffluentSampling Location Spokane Valley Interceptor Sampling Location Brown and Caldwell | DRAFT

  7. Sampling Location – Spokane Valley Interceptor (SVI) Pump Station Brown and Caldwell | DRAFT

  8. Sampling Location – North Valley Interceptor (NVI) Pump Station Brown and Caldwell | DRAFT

  9. Sampling Location – SCRWRF Effluent Brown and Caldwell | DRAFT

  10. Sampling Procedures Automated Sampler Sampler Calibration Teflon Tubing Composite Sample Bottle Sampler Intake Brown and Caldwell | DRAFT

  11. 2,3,7,8-TCDD Results NT = not tested U flags indicate the substance was not detected at the reporting level. K flags indicate a peak was detected but did no meet qualification criteria. The result reported is the estimated maximum possible concentration J flags indicate that the sample concentration was lower than the lowest calibration equivalent Brown and Caldwell | DRAFT

  12. PBDE Results NT: Not tested Brown and Caldwell | DRAFT

  13. PBDE Results Influent Brown and Caldwell | DRAFT

  14. PBDE Homologs – Influent Samples Brown and Caldwell | DRAFT

  15. PCB Results NT: Not tested Brown and Caldwell | DRAFT

  16. PCB Results Influent Brown and Caldwell | DRAFT

  17. PCB Homologs - Influent Samples Brown and Caldwell | DRAFT

  18. PCB Aroclor Results – Influent Samples Brown and Caldwell | DRAFT

  19. Common Uses of Aroclors Brown and Caldwell | DRAFT

  20. Next Steps (Draft) • Work with Ecology to update the QAPP • Begin trackdown sampling in collection system upstream of NVI and SVI pump stations Wastewater in County collection system Brown and Caldwell | DRAFT

  21. Potential Trackdown Strategies (Draft) • “Top-down” strategy - focus on known or suspected sources • “Bottom-up” strategy- systematic downstream to upstream approach Brown and Caldwell | DRAFT

  22. Land Uses by Basin Table 3 - 1. Land Use within the Five Basins D elineated on Figure 3 - 2 Land U se NVI Upper SVI Upper DMI SVI_Lower NVI_Lower Agricultural 3.1% 4.6% 4.4% 0.8% 0.0% Commercial 9.2% 14.7% 6.7% 13.9% 19.7% Forest/timber 1.6% 0.0% 1.6% 0.1% 0.0% Manufacturing 8.5% 0.5% 0.6% 1.2% 1.6% Mining 2.4% 0.6% 0.0% 3.5% 0.0% Parks, v acant 15.1% 5.7% 1.4% 4.2% 5.3% Residential 45.4% 60.0% 75.6% 50.1% 50.7% Right of Way 10.2% 12.9% 9.5% 21.1% 17.0% Transportation 2.4% 0.0% 0.1% 1.7% 4.6% Wholesale 2.0% 0.9% 0.1% 3.4% 1.1% Summary Residential 45.4% 60.0% 75.6% 50.1% 50.7% • Commercial/industrial/ROW 34.7% 29.7% 17.0% 44.9% 44.0% Open spaces 19.8% 10.3% 7.4% 5.0% 5.3% Brown and Caldwell | DRAFT

  23. Proposed Trackdown Approach (Draft) Brown and Caldwell | DRAFT

  24. Proposed Trackdown Locations for 2013 (Draft) Brown and Caldwell | DRAFT

  25. Questions? Brown and Caldwell

  26. PCB Monitoring Considerations Brown and Caldwell | DRAFT

  27. Potential PCB Sources Brown and Caldwell | DRAFT

  28. Potential PCB Sources Brown and Caldwell | DRAFT

  29. Potential PCB Sources Brown and Caldwell

  30. Potential PCB sources Brown and Caldwell | DRAFT

More Related