1 / 3

MTBF

MTBF. Moved to the 3.5sec slow spill Technically it is possible to deliver two 1sec spills Practically would depend on MIPP’s future Test beam operations getting more manpower Modifications like Helium pipe etc. in the works. Rates. Note on the rates. Single batch, single turn

garry
Download Presentation

MTBF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MTBF • Moved to the 3.5sec slow spill • Technically it is possible to deliver two 1sec spills • Practically would depend on MIPP’s future • Test beam operations getting more manpower • Modifications like Helium pipe etc. in the works

  2. Rates

  3. Note on the rates • Single batch, single turn • C’kov set for pions and electrons at 66 and 33 and only for electrons for the rest • Factor of 10 more beam readily deliverable • Steering more beam into MTest would require addressing activation issues

More Related