An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the active Divider production/certification Roméo BonnefoyandFrançois Vazeille Tilecal Operation and Maintenance weekly meeting CERN (4 July 2013)  Status •  Production made by Proto Process (Evian, France). • 350 active Dividers produced and delivered. • Certification made at Clermont-Ferrand and started • - Operators: Roméo Bonnefoy, Fabrice Podlyski, Timothée Theveneaux-Pelzer. • - Many Dividers rejected (see next slides). • 50 certified Dividers and QC delivered at CERN yesterday. • Other Dividers will be delivered in several steps. 1

  2.  Certification and Quality Control sheet Tests of 10  resistor Tests of capacitors Tests of voltages: Nominal voltage sharing Measures without current Percentages/nominal without current Percentages with current/without current Test Bench of batch of 10 Dividers at 1 kV Test duration: 20 minutes (automatically) + 5 minutes (10 ) + 10 minutes handling 2

  3.  QC results • A lot of Dividers are rejected, • mainly at the level of the HV cable. • A given base can cumulate several defaults. • 79% of cables are not OK. • A specialized Cie will redo the cables. • Proto Process will put them. • Clermont-Fd team will certify again.  Next actions + Radiation tests: Hardware/Software ready  Gammas (Argonne), Neutrons (France). 3