1 / 31

Potential & Experience of Dams in Ethiopia

Potential & Experience of Dams in Ethiopia. Solomon B. Gebre Project Manger Design of (four) dams in Lake Tana Sub-basin Project. Outline of the Presentation. Country Background Water Resources Potential & Status of Development Irrigation Hydropower Water Supply Existing dams

gary
Download Presentation

Potential & Experience of Dams in Ethiopia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Potential & Experience of Dams in Ethiopia Solomon B. Gebre Project Manger Design of (four) dams in Lake Tana Sub-basin Project

  2. Outline of the Presentation • Country Background • Water Resources • Potential & Status of Development • Irrigation • Hydropower • Water Supply • Existing dams • Lessons To be Learnt (Two Case Studies) • Dams under construction • Future for dams • Local Context • Regional Context

  3. Country Background • One of the 10 Nile Riparian Countries • Population - 72.4 Million in 2004 • Growth rate - 2.3 % per annum • Population by 2016 – 96 Million • Total Land Area - 1.104 x 10^6 Km2 • Socio-economy • Agriculture is the dominant sector • Largest Livestock population in Africa • Per Capita income 90 -100 USD • Water Supply coverage ca.35 % • Electricity coverage ca.

  4. Water Resources • 12 River Basins • Total Surface water Potential of 122 BCM • Renewable ground water Potential of 2.6 BCM • About 97% of the surface water drains to neighbouring countries • Water Tower • Contribution to Nile Water ca. 86 %

  5. Primary x-ics of Water Resources • Extreme interannual & Intra-annual variability • Droughts • 19 periods of widespread & severe food shortages in the past 100 yrs alone • Spatial variability of rain flow • Rainfall mainly in the highlands • Lowlands are arid to semi-arid • International nature of its most significant water resources

  6. Potential & Status of WR Development • Hydropower • Pot. Economical - 160 GWh or 30,000 MW • Developed: ca. 800 MW • < 3 % • Irrigation • Pot. Economical – 2.7 Million ha • Developed: ca. 290,000 ha • ~ 10.8 % • Water Supply coverage (Recent estimate by the MoWR) • Overall – 47 % • Urban – 80 % • Rural - 41 %

  7. Justification for Dams • Low level of development • Food security of its peoples • Access to Safe drinking water supply • Access to affordable electricity supplies • Resources of the country (Land, Water, Labour) • Water resources are highly variable (spatially and temporally) • Dams are required to safeguard its people against the ill-effects of recurrent drought and bring about development • Regional development – specially by tapping the country’s huge Hydropower Resources for the regional market

  8. Existing dams greater than 15 m in height from base to crest, or storage capacity exceeding 3 million cubic meters for heights between 5 and 15 m FAO - Aquastat Database 2006 10 Large dams Author’s compilation from various sources > 50 Large dams ( According to ICOLD Classification (2003))

  9. Important Large Dams in Ethiopia 13 Chara Chara Blue Nile 1996 9 9,100,000 Regulation * Inoperative since 1970 ** Only the dam construction has been completed CM: Cubic Meters HP-Hydropower, IRR-Irrigation WS-Water Supply, FP-Flood Protection

  10. Microdams • Small dams (micro-dams) constructed for irrigation supply are concentrated in the Northern Amhara and Tigray regional states. • Construction took place b/n 1995 – 2000 • 64 Dams in Tigrai Region • 28 are large dams according to ICOLD classification • 14 dams in Amhara Region • 12 are large dams according to ICOLD

  11. Performance of the Microdams • According to a study in 2003 (VLIR), out of the 64 microdams in Tigrai • Only 18 dams had no problems • 24 dams have seepage problem • Nine dams have sedimentation problems • 13 dams have both sedimentation & seepage problems • According to a study in 2006 (Tefera B.), out of the 14 microdams in Amhara • Only one of the 14 dams is functioning according to the plan of implementation • hydraulic problems (16.7%), • hydrological problems (41.7%), • sedimentation problems (33.3%), • seepage failures (58.3%), and • structural failures (8.3%).

  12. Damaged spillway (Hydraulic failure) • Syphon used to offtake water b/c of clogging of the intake

  13. Common Problems encountered in Microdams Common problems identified include: • Overtopping due to inadequate spillway capacity – flood estimation problem • Seepage through foundation, abutments and reservoir area – site selection problem • Cracking or structural failure – geotechnical problem • Less inflow in the reservoir – hydrological analysis problem • Sedimentation- design problem and lack of watershed Mgt. • Lack of proper maintenance and rehabilitation work • The rush in implementation without adequate investigation in all aspects Problems identified should give a good lesson for future building of similar dams.

  14. Dams under construction * Construction to begin soon

  15. Dams Under Construction Koga Dam Basin : Blue Nile Purpose: Irrigation Ca. 7000ha Project includes integrated WSM on 22,000ha Dam height 21m Embankment Dam Reservoir storage ~ Reservoir area ~ 1400 ha Financed by AfDB

  16. Dams under construction cont’d Kesem Dam • Basin : Awash • Multipurpose dam • Dam ht. 90m • Embankment Dam • Irrigation 20 – 30,000 ha of sugar cane • Hydropower – under study • Problems due to faults and artesian hot spring at dam foundation • Financed by ETH. Gov’t

  17. Dams under construction Cont’d Tendaho Dam • Basin : Awash • Irrigation dam • Dam ht. 40m • Embankment Dam • Reservoir storage 1.86 BCM • Irrigation 60,000 ha of sugar cane • Financed by Eth. Gov’t • When Kesem & Tendaho Projects start operation – sugar production will increase fivefold

  18. Dams versus the Environment Impact of Environment on Dams Impact of dams on the Environment Physical, biological and socio-economic impacts of dams • Reservoir sedimentation due to land degradation • Nutrient accumulation

  19. Koka Dam – Reservoir Sedimentation & Its Impacts (Eyasu E. 2003) • Sediment deposited in the reservoir (over the past 40 years) = 494 Mm3 • Average annual sedimentation rate = 12 Mm3 or 2115 t/km2  • Loss of storage volume from designed storage capacity: a) Designed storage capacity = 1,667 Mm3 b) Current storage volume = 1,186 Mm3 c) Loss of storage volume = 481 Mm3 • Remedial measures to reduce reservoir siltation • Sediment removal options • Flushing: Unacceptable downstream impacts • Dredging Cost: Very expensive US $ 8 – 9 per m3 This means US$3.9 Billion for Koka dam • Disposal • Other Engineering solutions • Raising the dam • Interbasin transfer of the river flow • This will have serious social & environmental problems • Catchment protection • Structural and Vegetative measures • Most practical and cost effective solution • Economic incentives to farmers • To encourage conservation-based farming

  20. • Loss of power generation capacity: c) Energy equivalent of per m3 of water = 0.266 KWh d) Energy equivalent of 481 Mm3 of lost volume = 128 Million KWh e) Price per KWh = 0.473 Eth. Birr f) Total money value of lost power generation capacity: 128 X 106 KWh X 0.473 Eth. Birr/KWh = 60.5 Million Birr or 7.5 Million USD Other secondary but important impacts are: • loss of Reservoir capacity to regulate water supply for irrigation and flood control services downstream. • which in turn resulted in breakage of dikes and flooding of sugar plants and down stream towns. • Severe flood hazards have become a common phenomenon in the downstream of Awash basin.

  21. Experience from Gilgel Gibe Dam • found on the Gibe River in the Omo-Gibe River basin • built for the purpose of hydropower. • Rock fill dam with bituminous upstream facing • Maximum height of 41m with a total storage capacity of 91 MCM • The generation capacity of the plant is 184 MW (three 61.3MW units); • Firm capacity 640GWH • started in 1997 • commissioned in 2004. • financed by the World Bank & the Government of Ethiopia.

  22. Category "A" Environmental Impact Classification due to some major environmental and social issues • the involuntary resettlement of 706 households (ca. 5,000 people); • loss of 300 ha of riparian forest for wildlife • altered downstream flow of 16 km of the Gilgel Gibe river, • and increased habitat for water-borne disease vectors • resettlement was completed two years ahead of impounding, 4 years ahead of completion of civil works. • resettlement cost was estimated at US$4,600 per household

  23. post-resettlement assessments carried out in Dec. 2005 • the resettlement program was indeed carried out according to the RAP in line with World Bank Guidelines • Positive Indicators: • the quality of the new houses is superior to the old houses • walking distance to health centers as well as schools has been considerably reduced • Underperformance indicators: • the average yield level for all types of crops has been reduced by 54%, • the number of livestock owned by the resettled household has been reduce by 72% • social infrastructure such as schools, health clinics, and water points are in poor condition and in need of immediate maintenance

  24. Conclusions Drawn from The Post-Resettlement Assessment • In spite of some underperformance, all indications point to the fact that the PAPs are better off now than prior to the resettlement effort • This has shown that with proper planning and implementation, it is possible to develop strong resettlement efforts • In resettlement matters, this project was the first one in the history of Ethiopia to carry a constitutional resettlement under the New Constitution • The Bank has also acknowledged (June 2001) the project as good practice.

  25. Planned dams • At present, the feasibility study and detail design of at least 12 large dams for irrigation development in four river basins is underway • When implemented, these dams will have a potential to irrigate well over 150,000 ha • MoWR has planned at least 20 power projects involving large dams with an aggregated power generation capacity of over 10000 MW which are at various levels of study • Four of these projects involve the construction of large dams on the main Blue Nile River. • When implemented, these projects will enable Ethiopia to export environmentally friendly power to its neighbors and Nile Basin riparian countries.

  26. Total 176,000 ha Total 2481 MW Involves 6 large dams Involves 7 large dams Regional projects under NBI • Projects accepted by the NBI Council of Ministers consist of 4 hydropower and 4 irrigation projects

  27. Dams in Lake Tana Sub-basin

  28. IN CONCLUSION • Ethiopia’s Path to Survival & Development Depends to a large extent on • Developing available resources (Land, Water & Labour) Which requires • Investing in Water Infrastructure where • Dams are at the heart of this investment However • Good governance of dams is a pre-requisite for sustainable development