IT3853-EN Design , Supply of Ventilation Units and Smoke Extraction Systems for Building 192

IT3853-EN Design , Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April 2013 Magali Mendez/ EN-CV. IT3853-EN Bidders Conference – 29.04.2013. Building 192. Summary of estimated flows .

gasha
Download Presentation

IT3853-EN Design , Supply of Ventilation Units and Smoke Extraction Systems for Building 192

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29th April 2013 Magali Mendez/ EN-CV IT3853-EN BiddersConference – 29.04.2013

  2. Building 192

  3. Summary of estimated flows

  4. AHUs to be supplied and installed by the contractor

  5. Exhausts fans for smoke extraction to be supplied and installed by the contractor Chapter 7.2.4 of the rule EN 13501-4

  6. The Supply • Design • Dismantling of the existing installation • Design and studies of Smoke extraction and HVAC systems • Packing • Shipping to Bldg.192 • Installation • Tests • Commissioning • Documentation

  7. The HVAC and smoke extraction systems (summary) • Ducts for ventilation system • Exhaust fans, fresh air fans, ducts • Dampers, firedampers • Stainlesssteelpipework, supporting, metal structures, • Instrumentation, controlscubicle, cabling.

  8. Specification of the Supply: Electricity

  9. Specification of the Supply: Electricity Included in the supply Erratum: limit of the supplyincludes the power cubicle, revised version of this document to beprovided by CERN Erratum: limit of the supplyincludes the power cubicle, revised version of this document to beprovided by CERN

  10. Specification of the Supply: Controls

  11. Specification of the Supply: Controls Clarification on the information required for CERN to prepare the PLC control system software The contractor shall allow in the schedule a minimum four weeks for the programming of the PLCs by CERN.  In order to start the programming of the control system, CERN requires the following four documents to be finalised - submitted and approved: 1. P&IDs - with the correct GMAO and tag references. 2. Electrical Schematics 3. I/O List 4. Functional Description It is therefore essential that the above documentation and drawings are submitted, revised as required and finalised in accordance with the schedule, such that the preparation of the controls does not impact the scheduled testing and commissioning period.

  12. Building 192 Technical Room Spaceconstraints

  13. Roof installations Fresh air for smoke extraction- Stairs Air conditioning Smoke extraction- Basement Fresh air for smokeextraction-Basement Freshair for smokeextraction- Groundfloor HT zone

  14. Ground floor

  15. Basement

  16. Specification of the Supply

  17. Schedule

  18. Thanks for your attention! Questions?