1 / 8

Building Your Transmission Backbone

Wi – Com Communication Contracting Company Profile:. cc. Reg: 156934/23. Building Your Transmission Backbone. RF Planning Installations Commissioning Advanced Test Procedures Maintenance Contracts Recovery Project Management Quality And Acceptance Turnkey Solutions. Microwave Radio

gavan
Download Presentation

Building Your Transmission Backbone

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wi – Com Communication Contracting Company Profile: cc. Reg: 156934/23 Building Your Transmission Backbone

  2. RF PlanningInstallationsCommissioningAdvanced Test ProceduresMaintenance Contracts RecoveryProject ManagementQuality And AcceptanceTurnkey Solutions Microwave Radio Opticfiber Vsat

  3. Company Technical Skills: • Microwave , Radio & VSAT Skills ranging from HF to SHF : Point to multi point ,TDMA , FDMA , eMGW , WiMax , Mini Link short hall Microwave, Ericsson , Plessey/Tellumat , Nera Metro , Nera Edge , Tellabs . • Radio: Ditex ,Plessey , Exicom , • VSAT : Hughes , Ghilat , Skystar. • Various Transmission and Optical technologies.

  4. Building Your Transmission Backbone:

  5. Management: Etienne Simon Heinrich Scheepers Corrie Jacson Together 65 years experience in Transmission Equipment specializing in Optical and Wireless technologies.

  6. Completed Projects 2009: • DiTex Radio Planning (CZ Elect, Telkom SA, WC & NC) • DiTex Radio Installations. (CZ elect, Telkom SA, NC) • Wimax Site surveys BOM Planning. (Central region) • eMGW Site surveys BOM Planning. (Central region) • eMGW Installations (Saab Grintek ,Telkom SA ,WC) • eMGW Installations (Saab Grintek ,Telkom SA NC) • Nera MW Installations (Saab Grintek , Vodacom GP ) • Tellabs installations (Saab Grintek Vodacom GP) • Nera Microwave installations (Saab Grintek , Vodacom 60 links start Jan 2010 NW )

  7. The Staff / Team Building:

  8. Contact Details: Etienne Simon 083 5588 475 (sel) 023 341 2020 (office) 086 563 0222 (fax) wicomcc2@gmail.com wicomcc@gmail.com Contact details: Heinrich Scheepers 084 526 3560 (sel) 023 3420915 (office) scheeph@telkomsa.net http://wicomcc.synthasite.com/ Vat Reg: Vat reg: 4740248762

More Related