1 / 14

Agenda item 1 Real examples of impact of wind turbines on radar operations

Agenda item 1 Real examples of impact of wind turbines on radar operations. Daan Rabijns, Belgocontrol. 4 cases. measurable effects of a single turbine at 60 km from the radar severe operational impact: Büchel (GE) severe operational impact: Villancien (Fr)

gavivi
Download Presentation

Agenda item 1 Real examples of impact of wind turbines on radar operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda item 1Real examples of impact of windturbines on radar operations Daan Rabijns, Belgocontrol

  2. 4 cases • measurable effects of a single turbine at 60 km from the radar • severe operational impact: Büchel (GE) • severe operational impact: Villancien (Fr) • example with tolerable operational impact

  3. case 1: a single turbine (142m) at 60 km

  4. case 1: measured impact primary only mode S only combined

  5. Case 2: unacceptable impact ASR Cells 200 x 200 m2 • No track initiation within the cells • Only update of existing tracks

  6. Case 2: example 1, Airliner FL350  wind turbine  plot (not shown to ATCO)    Track (shown to ATCO)     Track initiation delay: 3 scans Coasting : 3 scans                           Radar

  7. Case 2: example 1, Fighter Approach  wind turbine  plot (not shown to ATCO)    Track (shown to ATCO)     Track initiation delay: 3 scans Coasting : 3 scans                         Radar  

  8. Case 3: turbines 34 km from the radar 4/6 turbines 142m radar test flight

  9. Case 3: turbines 34 km from the radar

  10. Case 4: tolerable operational impact

  11. Case 4: tolerable operational impact 10 turbines 149m Cessna aircraft w/o transponder landing aircraft

  12. Case 4: tolerable operational impact

  13. Conclusions • case 1: Impact on PSR can extend to end of radar range • case 2 and 3: Impact not tolerable • case 4: Tolerable impact on ATCO screen examples can not be generalized

  14. Daan Rabijns Belgocontrol Tervuursesteenweg 303 B-1820 Steenokkerzeel phone : +32 2 206 22 15 fax : +32 2 206 22 01 rad@belgocontrol.be www.belgocontrol.be

More Related