Overview of HIFI ILT Willem Luinge TRR 15 – 16 August 2006, Groningen
Outline • Big picture • Documents • Short Test overview • Status Testequipment • Test team • Organogram analysis teams • Open, critical items
Documents • Reference documents, VCM • AIV plan • Detailed AIV plan (FM ILT): under configuration control after this review • HIFI ILT Integration and Functional Test Procedure (calls for the scripts): under configuration control after this review • “HIFI ILT Performance Test Procedure” • FM ILT CUS scripts, including documents (e.g. a description: CUS scripts for HIFI FM tests), configuration files • MIB(’s) • IA use cases document and IA tools • Various integration, configuration procedures, manuals • A list of websites was added to the TRR data package • Issue for TRR: content of procedures for ILT and approach
Short Overview of the various tests • Tests after integration of various subsystems • Not complete • This TRR: No emphasis on integration • Integration and Functional test • Get HIFI functioning, incl. tunings, OBSW, scripts, EGSE, • One frequency per sub band • Integration (first time FT): implement in scripts effect of thermal time constants, harness • Beam measurements • Alignment with telescope • Radiometry • Stability • Spectral tests • Operational procedures
Man power support FM ILT campaign • Mechanical integration: RvdS, ME, LM, WH • Operation, installation of LO sources: NW, WJ, PD, MJ • Alignment issues: BK, MJ, RH, ME • Test equipment handling (vacuum & cryogens): WH, FW • Electrical integration: HS, AN, HG • EGSE, MIB: LD (back up NB, AdJ) • Operators: NB, RH, (MB), back up: AdJ • ICC (software infrastructure, database, IA, etc): AdJ, KE, PZ and others • CUS scripts: DT • Analysis & reporting: Testengineers, system engineer, calibration group, others • General: Contact persons for various subsystems
Remarks • Part time involvement of almost all • TE is responsible for plans, preparations (test equipment, availability of scripts, procedures), quick look analysis, analysis, evaluation, reporting • Script testing: // set up for off line activities and script testing: not (fully) operational • Analysis is done with IA, Wiki page for discussion • An overview plan – scripts – tools is summarized by Peter Roelfsema (tools not fully tested during DM, QM) • Test operators are running test scripts according to procedure only. No manual commanding • In case of non conformance: NCR or SPR first, notify TE, discuss the next steps (correct script, MRB, diagnostics (via extra script), ..; no manual commanding!) • Every step in the procedure is logged in an electronic log • All other activities in room 50 are logged as well • Safety: separate agenda item
Major open items Test equipment • [qualification of test equipment during DM, QM, FM1, 2] • Stable operation of FPU cryostat • Change to TEI controlled operation of re-imager: incomplete, untested • Gas cell modifications: incompletely tested • Linearity tests never exercised (beamspliters in LO beam or via reimager); parts available • Matching optics re-imager (pupil-to-field never used with re-imager) not used so far (fit check soon) • Absorption in nitrogen gas flushed cryostat coupling (2 window version of the LOU/FPU cryostats): adequate? • Hermetic rack (e.g. isolation and cooling plate modification): adequate?
Critical issues • Safety issues • a.o. drill to solve a problem in the proper, safe way (see Remarks); operator: no signed procedure: no test • Implementation of grounding and shielding plans, electrical handling • Back up for key persons • Stability of EGSE/Test control • Reliability of scripts before use: ‘NO’ debugging on flight hardware
Plan of attack: • Procedure and scripts to be signed off by author before use • Use test harness (prepared, not operational) • Test on parallel set up (as far as possible) • Test engineer to ‘read’ the scripts/procedure • Last line of defense: S/S cannot be damaged by wrong commands: no single, manual commands!