B ldg 275 for CMS Alignment & Sensors lab. ISR & buildings 184, 283: 3000 m 2 lab. Usage 2000-2010. Vacated for RP. Vacate by ~Mar 2012. Vacate by ~Mar 2012. Align. Active storage Cable storage Calibration. Mu and ECAL Tooling. Clean room. Bat 283. Cabling. RPC lab. Alignment
E N D
ISR & buildings 184, 283: 3000 m2 lab Usage 2000-2010 Vacated for RP Vacate by ~Mar 2012 Vacate by ~Mar 2012 Align Active storage Cable storage Calibration Mu and ECAL Tooling Clean room Bat 283 Cabling RPC lab Alignment optical lab Tracker tooling, 278m2 Vacated for Medaustron Atlas Destinations: 904, tooling tent, SX5, others: as per 24 Sept 09 Site Committee
ISR & buildings 184, 283: 3000 m2 lab ECAL Storage CSC Cables Storage (904?) DT Storage Clean Room (to 904) Muon Transport Frames Muon Transport Frames Muon Transport Frames FWD RPC Storage DT Storage RPC Cave #1 FWD RPC Lab Workshop Original Future RPC Assembly area (1400m2) Re-assigned Jan 2010 (MedAustron) I4 Isob Barrack I3 Alignment benches Alignment benches To be vacated 2009-10 283 278m2, TK storage
Surface Facilities: 904 zone A.Sharma, D. Hay
Surface facilities: 678 : 500m2 storage “tent” Critical to the logistics sequence of liberating ISR and re-equipping SX5 Nov 2011: another tent will be needed to clear tooling in ISR
ISR: conditions naturally stable enough Cut & fill tunnel-beam & expt slabs --> Floor stability excellent Temperature 21 ± 3 degrees C (for RPC 20 ± 2 is ideal) Relative humidity: 45 ± 10 % (For RPC 40 ± 5 % is ideal) Building mods & HVAC to achieve these conditions in all of 904 VERY expensive: CMS suggestion to use temperature-controlled internal lab enclosures with central HVAC
Alignment laboratory: DT , MAB + Link calibration benches No alternative location with similar stability identified so far –becoming urgent Tilt bench Link area Diagonal bench MAB storage area MAB transport box MAB calibration bench Camera calibration bench Chamber Alignment bench Move and re-survey cost estimate: 30k CHF 2009.03.12. Moving calib benches of the Alignment 7
Plan for the ground floor Position sensor test bench MAB storage /Bench control Load zone Alignment benches • Remove walls of R-010 and R-006 • Probably keep the platform in the hall • Mobile (rolling, steel frames) MAB storage . • build new personnel door and a small SAS(temperature stability) • Camera bench and Barrel bench controls are in the MAB storage area • Large open space in front of Tilt bench to allow truck to get in to pick up MAB box • Possible location for 4T mini-magnet
Plan for the 1st floor • merge 1-008 and 1-006: office • merge 1-001 and 1-004 lab • extend balcony to 1-203 • move door of 1-001 • (if possible) keep platform in hall for storage office office B- sensor + camera Lab BFG (fibre)
Complication : Building structue • floor thickness is ~20 cm • floor is built up of independent slabs • ‘bunker’ to be filled up with concrete
Measurements and refurbishments • Intrinsic floor stability looks (surprisingly) good but must be measured in detail • Install Survey network • Vibration measurements while heavy vehicles go past the building, exit firestation • See if daytime use of the alignment benches is possible. • Revision of the full electric network • Revision and rethinking the HVAC for better year-round stability ~ ISR (removing the tower, and the piping at the back of the building) • Insulation of the building? • New personnel door near main access door , equipped with small SAS. • Change to faster opening main access door. • TOTAL needed: guess :400kCHF..awaiting estimates
View from the 1st floor Entrance Supervised area
Storage room Storage room Backdoor opens from storage room Storage room Window of supervised area Behind the supervised area Staircase Crane