1 / 21

Bonjour Olivier,

Bonjour Olivier, J’ai étudié ici la possibilité pour nous de prendre le « Common L1 module » en place du CROP. Pour ce faire, j’ai regardé les implications qu’entraînerait ce choix pour le détecteur ECAL.

gayden
Download Presentation

Bonjour Olivier,

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bonjour Olivier, J’ai étudié ici la possibilité pour nous de prendre le « Common L1 module » en place du CROP. Pour ce faire, j’ai regardé les implications qu’entraînerait ce choix pour le détecteur ECAL. Je n’ai pas cerné en détail les autres détecteurs HCAL, PreShower et SPD mais à priori il ne poserons pas de difficulté majeure. (HCAL=>1 L1module/densité; PRS+SPD:pas de voisinage). Pour ECAL, je suis obligé de reconsidérer le mapping: détecteur<>module FEE. Bien sur je ne dois sûrement pas maîtriser tout les aspects, mais j’ai fais de mon mieux pour prendre en compte les contraintes de votre design. A chaque diapositive, j’y ai associé un commentaire permettant de suivre les propositions que je décris. J’attends bien sur vos commentaires. De plus, toute l’équipe électronique du LAPP (Daniel Boget, Pierre-Yves David, Nicolas Dumont-Dayot, Michel Moynot et moi-même) désirons te rencontrer pour connaître plus de détail sur la manip et ses réalisations. (timing L0,L1. L2?, contraintes du mapping, temps mort, …..). Quand pourrais-tu venir au LAPP? PS: je suis absent du 23 janv au 3 fev. -1-

  2. ECAL Left: Actual design with CROP 14 14 12 16 Crates 1 and 2 2 3 4 5 6 7 8 9 10 11 12 13 14 13 13 11 15 3 CROP 1 12 12 10 14 Crate 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 11 11 9 13 12 12 14 16 10 10 11 11 13 15 14 11 14 10 10 9 9 13 10 13 CROP 2 9 9 12 9 12 Crates 4 and 5 3 4 5 6 7 8 9 10 11 12 13 14 15 16 11 8 1 2 8 8 7 4 8 8 10 7 7 7 9 6 6 8 5 5 6 6 6 7 7 7 4 4 5 5 6 3 3 4 5 4 14 16 Crate 6 4 3 4 5 6 7 8 9 10 11 12 13 14 6 6 3 3 13 15 5 5 4 8 CROP 3 No neighbours 4 4 3 7 3 Crate 7 3 4 5 6 7 8 9 10 11 12 13 14 3 3 2 6 2 2 1 5 Validation CROC Validation Card Card -2-

  3. Total ECAL: Actual design with CROP CROP FEE Crate (with 16 FEE modules inside) 7 for Left side 7 for Right side 3 for Left side 3 for Right side Total = 14 Crates Total = 6 CROP -3-

  4. CROC CROC CROC Remember: Lyon Meeting. CROP/Common_L1_module L1Buffer L1Buffer L1Buffer 16 FEE module for PRS or SPD or ECAL or HCAL CROP DAQ Trigger system and TTC 16 links= 2 optic rubbons with 12 links (each) Common L1 module 16 FEE module for PRS or SPD or ECAL or HCAL DAQ CROCv2 L1Buffer TTC Possible output L1 unused Trigger system and TTC -4-

  5. CROP versus Common L1 Module CROP Common L1 Module -5-

  6. Common L1 Module Inputs for ECAL • Each Input use a fiber optic rubbon with 12 channel (12 fiber optic links) Can accept 12 ECAL FEE modules with a fiber optic rubbon Can accept 12 ECAL FEE modules with a fiber optic rubbon -6-

  7. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Crates 4 and 5 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Crate 6 3 4 5 6 7 8 9 10 11 12 13 14 Crate 7 3 4 5 6 7 8 9 10 11 12 13 14 ECAL Left for Common L1 module: proposal 1 4 8 12 16 Crates 1 and 3 3 7 11 15 1 Low granularity 2 6 10 14 Crate 2 4 5 6 7 8 9 10 11 12 13 1 5 9 13 8 13 15 3 8 13 7 12 14 2 4 7 11 14 6 11 7 12 6 10 13 5 10 Medium granularity 5 9 12 6 4 8 2 4 9 6 11 3 11 8 13 6 10 5 9 14 7 12 7 5 10 4 8 13 6 11 5 3 7 12 5 10 15 3 4 9 4 9 14 2 4 8 12 16 High granularity No neighbours 3 7 11 15 3 2 6 10 14 1 5 9 13 Validation CROC Validation Card Card -7-

  8. 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 Crate 1 Crate 3 ECAL Left for Common L1 module: proposal 1 Low granularity 8 fiber optic links used / 12 8 fiber optic links used / 12 Horizontal copy Crate 2 4 5 6 7 8 9 10 11 12 13 10 fiber optic links used / 12 Horizontal copy 8 fiber optic links used / 12 8 fiber optic links used / 12 -8-

  9. Crate 5 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ECAL Left for Common L1 module: proposal 1 Medium granularity Crate 4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 7 fiber optic links used / 12 7 fiber optic links used / 12 Horizontal copy 7 fiber optic links used / 12 7 fiber optic links used / 12 -9-

  10. Crate 6 3 4 5 6 7 8 9 10 11 12 13 14 Crate 7 3 4 5 6 7 8 9 10 11 12 13 14 ECAL Left for Common L1 module: proposal 1 High granularity 12 fiber optic links used / 12 12 fiber optic links used / 12 -10-

  11. FEE Crate (with 16 FEE modules inside) 7 for Left side 7 for Right side Total = 14 Crates Total ECAL for Common L1 module: proposal 1 Common L1 module 6 for Left side 6 for Right side Total = 12 Modules -11-

  12. Crates 1 and 4 3 4 5 6 7 8 9 10 11 12 13 14 Crate 2 5 6 7 8 9 10 11 12 4 5 6 7 8 9 10 11 12 13 2 3 4 5 6 7 8 9 10 11 12 13 14 15 3 4 5 6 7 8 9 10 11 12 13 14 3 4 5 6 7 8 9 10 11 12 13 14 ECAL Left for Common L1 module: proposal 2 5 8 11 14 4 7 10 13 1 Low granularity 3 6 9 12 7 10 11 12 2 8 13 15 3 6 9 7 12 14 2 5 7 11 14 6 11 Crate 3 5 8 6 10 13 5 10 5 9 12 7 4 8 4 9 7 11 3 11 Crates 5 and 6 8 13 6 10 Medium granularity 5 9 14 7 12 8 6 10 4 8 13 6 11 6 3 7 12 5 10 15 3 5 9 4 9 14 2 3 4 8 12 13 Crate 7 High granularity 5 8 11 14 4 4 7 10 13 Crate 8 3 6 9 12 -12-

  13. 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 5 6 7 8 9 10 11 12 4 5 6 7 8 9 10 11 12 13 ECAL Left for Common L1 module: proposal 2 Low granularity Crate 1 12 fiber optic links used / 12 8 fiber optic links used / 12 Crate 2 Horizontal copy Crate 3 10 fiber optic links used / 12 12 fiber optic links used / 12 Crate 4 -13-

  14. Crate 6 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ECAL Left for Common L1 module: proposal 2 Medium granularity ~= proposal 1 Crate 5 2 3 4 5 6 7 8 9 10 11 12 13 14 15 7 fiber optic links used / 12 7 fiber optic links used / 12 Horizontal copy 7 fiber optic links used / 12 7 fiber optic links used / 12 -14-

  15. Crate 7 3 4 5 6 7 8 9 10 11 12 13 14 Crate 8 3 4 5 6 7 8 9 10 11 12 13 14 ECAL Left for Common L1 module: proposal 2 High granularity ~= proposal 1 12 fiber optic links used / 12 12 fiber optic links used / 12 -15-

  16. FEE Crate (with 14 FEE modules inside) 8 for Left side 8 for Right side Total = 16 Crates Total ECAL for Common L1 module: proposal 2 Common L1 module 5 for Left side 5 for Right side Total = 10 Modules -16-

  17. ECAL Left for Common L1 module: proposal 3 Crates 1 and 4 3 4 5 6 7 8 9 10 11 12 13 14 Crate 2 5 6 7 8 9 10 11 12 4 5 6 7 8 9 10 11 12 13 Crates 5 and 7 5 6 7 8 9 10 11 12 3 4 5 6 7 8 9 10 11 12 13 14 3 4 5 6 7 8 9 10 11 12 13 14 Crate 6 3 4 5 6 7 8 9 10 11 12 13 14 5 8 11 14 4 7 10 13 1 Low granularity 3 6 9 12 7 10 11 12 2 6 8 10 12 5 6 9 5 7 9 11 Crate 3 7 11 14 8 14 5 8 6 10 13 7 13 5 9 12 8 4 8 6 12 7 11 3 11 6 5 11 6 10 Medium granularity 5 9 14 4 10 9 6 10 4 8 13 3 9 3 7 12 6 8 10 12 7 5 9 5 7 9 11 3 4 8 12 13 Crate 8 5 8 11 14 4 High granularity 4 7 10 13 3 6 9 12 Crate 9 -17-

  18. 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 5 6 7 8 9 10 11 12 4 5 6 7 8 9 10 11 12 13 ECAL Left for Common L1 module: proposal 3 Low granularity = proposal 2 Crate 1 12 fiber optic links used / 12 8 fiber optic links used / 12 Crate 2 Horizontal copy Crate 3 10 fiber optic links used / 12 12 fiber optic links used / 12 Crate 4 -18-

  19. Crate 5 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 3 4 5 6 7 8 9 10 11 12 13 14 ECAL Left for Common L1 module: proposal 3 Medium granularity 8 fiber optic links used / 12 12 fiber optic links used / 12 Horizontal copy Crate 6 8 fiber optic links used / 12 Crate 7 -19-

  20. Crate 8 3 4 5 6 7 8 9 10 11 12 13 14 Crate 9 3 4 5 6 7 8 9 10 11 12 13 14 ECAL Left for Common L1 module: proposal 3 High granularity ~= proposal 1 12 fiber optic links used / 12 12 fiber optic links used / 12 -20-

  21. FEE Crate (with 12 FEE modules inside) 9 for Left side 9 for Right side Total = 18 Crates Total ECAL for Common L1 module: proposal 3 Common L1 module 5 for Left side 5 for Right side Total = 10 Modules -21-

More Related