60 likes | 148 Views
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, Sept 2010 Meeting Date Submitted: Sept 16, 2010 Source: Raymond Krasinski, Philips 345 Scarborough Road, Briarcliff Manor, NY 10510
E N D
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, Sept 2010 Meeting Date Submitted: Sept 16, 2010 Source: Raymond Krasinski, Philips 345 Scarborough Road, Briarcliff Manor, NY 10510 Voice: 1-914-333-9687, FAX: 1-914-332-0615, E-Mail: raymond.krasinski@philips.com Abstract: Closing report for MBAN Study Group Purpose: To outline the accomplishments of the group during the Sept 2010 Interim meeting Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Raymond Krasinski, Philips
IEEE 802.15 MBAN SG Closing Report 3rd Meeting of the MBAN Study Group Hawaii, USA Sept 12-16, 2010 Raymond Krasinski, Philips
Mission of MBAN SG • Study the prospects of an amendment of 802.15.4 for MBAN • If a task group is created it is expected to define any modifications required to the existing PHY and the possible modifications to the MAC needed to support the PHY that complies with the FCC MBAN regulations • Generate a draft MBAN PAR and 5C Raymond Krasinski, Philips
Progress Sept 2010 Meeting • Final review of PAR and 5C • Walked through PAR and 5C • Made small editorial changes to PAR and 5C • Held a successful vote within MBAN SG to show agreement that the PAR and 5C are complete and should be brought to the full 802.15 workgroup for consideration Raymond Krasinski, Philips
Progress Sept 2010 Meeting (cont) • Brought a vote to the 802.15 Work Group requesting PAR and 5C be posted to the 802 EC agenda for WG 802 preview and EC approval for submission to NesCom • Motion passed Raymond Krasinski, Philips
Planning for Next Meeting • Address WG 802 comments received on PAR and 5C • Create final version of PAR and 5C for consideration by 802 EC Raymond Krasinski, Philips