530 likes | 639 Views
Kitty Chan UC Berkeley. Robert Alvarado. architect. owner. Chad S. Green Stanford University. Mission: To work together as AEC in creating a meaningful space for the users in 2010. engineer. Yuning Wang Stanford University. contractor. Site.
E N D
Kitty Chan UC Berkeley Robert Alvarado architect owner Chad S. Green Stanford University • Mission: To work together as AEC in creating a meaningful space for the users in 2010. engineer Yuning Wang Stanford University contractor
Site • The site is at Central University in Los Angeles, California • University of San Francisco is picked as the reference site.
Vision for 2010 • Students and Faculty interfacing with computers in their daily functions in the department.
Design Alternates SQUARE ZIGZAG TOWERS SUNDIAL
Design Review – Construction • Economic design; good constructibility • More connections due to zigzag shape; irregular formwork needed • Masts expensive, difficult to install; expensive to excavate basement • Slanted columns difficult to install; precast members easier
Design Review – Engineer • Good lateral support; unchallenging design • Rigid & symmetric; issues with torsion • Long cantilever; low redundancy; large point load above auditorium • Torsion issues; long spans; no place to fit shear walls
Design Review – Architect • Uninteresting exterior, poor circulation • Interesting exterior, atrium • Good interiors, interaction space • Relates to religion, nature, and spatial
Preferred Alternate SUNDIAL
Exterior View morning noon afternoon
Elevation • Using surrounding context to define the building • Reading the building from the inside East Elevation South Elevation
Basement • Viewing the Mechanical Room • Seeing the structure of the auditorium
1st Floor • Dual Usage • Auditorium • Hallway
2nd Floor • Hallways as telescope
2nd Floor (cont’d) Before After
3rd Floor • Faculty & Student Offices
Program Requirements Program Design
Natural Ventilation • Using the wind for natural ventilation for the building • Cone serving as a greenhouse on the exterior layer
Solar Power • Los Angeles Weather • Solar Power for Daytime Electrical Use • Skylights for Natural Lighting
Interaction with Architectural Program Auditorium Large Classroom Large Classroom First Floor
Interaction with Architectural Program Computer Room Small Classroom Small Classroom Second Floor
Interaction with Architectural Program Office Space Office Space Third Floor
Iterations – AEC E A C A C A E Beams Floor Slabs Hanging from Beams
Discussion on how HVAC will run through the building Location of Utility Floor Top vs. Bottom Iterations – A&C
Iterations – A&E Dome Structure Layout Changed to Fit Architectural Program
Iterations – A&E Slanted Walls Caused Columns to Be Moved In
Northridge Earthquake • 1994 • 6.7 magnitude • 9,000 injured; 51 fatalities • $44 billion in damages (costliest in US history) • 29,000 buildings yellow- or red-tagged • Steel SMRF experienced unexpected cracks
PHMRF System • BENEFITS: • Faster delivery time • Increased safety • Structure retains value
Typical Structural Members • Floor Slabs: 8X20 Double Tee 50’ max span 2” topping • Beams: 24X20 L-Beam 24X32 Inverted T-Beam 30’ max span • Columns: 12X12 Interior 24X24 Exterior/Moment max M = 525 k-ft
Computer Analysis Max M = 572 k-ft Max P = 486 k Max M = 852 k-ft Max P = 652 k Earthquake Design – Weight of Structure, W = 4100 k Base Shear, V = 472 k Story Shear, Fx = 118 k Max Deflection = 1”
Computer Analysis Max M = 572 k-ft Max P = 486 k Max M = 852 k-ft Max P = 652 k Earthquake Design – Weight of Structure, W = 4100 k Base Shear, V = 472 k Story Shear, Fx = 118 k Max Deflection = 1”
Structural Details • Steel Reinforcing in Dome Floor Slabs & Elevator Core Six #14 Bars 18” spacing Develop. Length = 72”
Structural Details Cantilever of Precast Double Tee Slabs
Structural Details Span of the Dome Structure 20’ 18”
Foundation • Sandy Soil • Likely Low Water Table • Earthquake and Liquefaction Max Column Axial Load = 486k Soil Bearing Capacity = 4ksf Footing Area = 120 sqft Footing = 11’ X 11’ Max Uplift Force = 118k
Construction Cost • Total Cost • Present Value: $4,270,936 • 2010 Value: $5,663,944 • 3% over budget • Structural System: $582,959 • 72% over budget Site Work Exterior Structural System
Construction Schedule Mon. Sept. 6, 2010 Jan. 31, 2011 Fri. May. 11, 2011
Construction Equipment • Terrain Crane, 40 ton • Backhoe Loader, 48 H. P. • Dump Truck, 16 ton • F. E. Loader T. M. 2.5 C.Y. • Truck • Gas Engine Vibrator • Gas Welding Machine
Construction Sequence I. II. Cone is cast-in-place Construct cone first
MEP Layout • Solar Energy system • Saves energy costs during life cycle • Issue of heat loss • Utility floor • Solves floor height problem • Saves life cycle cost of further expansion • Structural system + Wall: about $280,000 Horizontal Distribution
Structural System Evaluation • Largely Precast Concrete • Saving labor • Few shear walls • Shipping cost: approximately $80,000 • Lead time: detail shop drawing, pre-casting • Re-stressing cables over life cycle • Slanted columns in Cone
Team Interaction NetMeeting Videoconferencing Whiteboard Sketches Discussion Forum