1 / 19

METROLOGICAL TRACEABILITY FOR METEOROLOGICAL SENSORS ILLUSTRATED THROUGH EXAMPLES

METROLOGICAL TRACEABILITY FOR METEOROLOGICAL SENSORS ILLUSTRATED THROUGH EXAMPLES.

gefen
Download Presentation

METROLOGICAL TRACEABILITY FOR METEOROLOGICAL SENSORS ILLUSTRATED THROUGH EXAMPLES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. METROLOGICAL TRACEABILITY FOR METEOROLOGICAL SENSORS ILLUSTRATED THROUGH EXAMPLES MirunaDOBRE– SMD (Belgium)Stephanie BELL– NPL (United Kingdom)Doloresdel CAMPO– CEM (Spain)MarttiHEINONEN- MIKES (Finland)Domen HUDOKLIN– LMK (Slovenia)GiuseppinaLOPARDO, AndreaMERLONE – INRIM (Italy) http://economie.fgov.be

  2. Why do I need traceability? International Vocabulary for Metrology (VIM) definition: “property of a measurement result whereby the result can be related to a reference through a documented unbroken chain of calibrations, each contributing to the measurement uncertainty”. • Confidence in the • Quality of my measurement and • Equivalence to other similar measurements http://www.bipm.org/en/publications/guides/vim.html

  3. International agreement (CGPM decision) The unbroken chain of calibrations Maintained by National Measurement Institute ( unit realization) Compared with primary standard (calibration at NMi) Compared with secondary standard (calibration at accredited or final user’s lab) Compared with working standard (in-field or lab. calibration) http://economie.fgov.be

  4. A measurement has metrological traceability if: • An unbroken and documented chain of calibrations links the instrument to an internationally agreed reference; • Each chain link has documented uncertainty estimations; • The final user has procedures to ensure that the instrument maintains its calibration with associated uncertainties over time; • The influence factors affecting the measurement are quantified and a total measurement uncertainty is calculated, documented and reported with the result. http://economie.fgov.be

  5. The unit definition and its practical realization USA ismembersince 1875 • Signed by 17 countries on 20 May 1875 • Today 56 Member States and 37 Associates www.bipm.org 7 base units The kelvin, unit of thermodynamic temperature, is the fraction 1/273.16 of the thermodynamic temperature of the triple point of water. Many derived units The pascal, unit of pressure or stress, is the force applied per unit area. www.bipm.org http://economie.fgov.be

  6. Thermometry practical reference standards Discrete reference scale: Fixed point cell Interpolation instrument: Standard platinum resistance thermometer http://www.bipm.org/en/publications/mep_kelvin/ http://economie.fgov.be

  7. ITS 90 http://www.nmij.jp/english/library/units/temperature/ http://economie.fgov.be

  8. Unbroken chain of calibrations for temperature measurements For measurements in air see for example the calibration of climaticchambers guide: www.dkd.eu/dokumente/.../dkd_r_5_7_e.pdf Measurement in lab. and in liquid http://economie.fgov.be

  9. Traceability scheme for resistance thermometry measurements Traceability/uncertaintycalculation startfrom the mathematicalmodel Traceabilityfor the measurandY = traceability for all the input quantitiesxi http://www.bipm.org/en/publications/guides/gum.html http://economie.fgov.be

  10. Humidity quantities - what is the measurand? • Humidity is a general term encompassing: • Vapourpressure (partial pressure) of water (in units of pressure) • Dew-point temperature [and frost point] (in units of temperature) • Composition (dimensionless) • Relative humidity (dimensionless) but symbol %rh used (also %hr, %ur, %rF, etc) - not very standardised! • And other less-used parameters http://economie.fgov.be

  11. Humidity primary standards • By measurements: gravimetric hygrometer • By realizations: a system that can produce a gas stream of known humidity • By saturation at defined pressure(s) and temperature(s) • By gas blending, … http://economie.fgov.be

  12. Humidity primary standards Humidity = mass of water vapor in a unit volume of moist air at a given temperature and pressure. • Absolute humidity generator operation: • Saturate the gas with water at a known temperature and pressure. • The mole fraction x of water vapor in the gas is • For 2-p expand till atmosphere, for divided flow mix withknownamounts of dry gas (traceableflowmeters) water vapor pressure enhancement factor uncertainty due to formulae calculations http://economie.fgov.be

  13. Humidity primary standards http://economie.fgov.be

  14. Traceability scheme for humidity measurements http://economie.fgov.be

  15. Traceability scheme for humidity measurements http://economie.fgov.be

  16. Mass reference Length reference Temperature reference m A p Important influence Primary standards in pressure measurement Laser interferometric manometer Piston gauge http://economie.fgov.be

  17. Primary standards in pressure measurement • Othereffectsaffectingmeasurementresult: • dilatation of piston and cylinder due to temperature and pressure; • surface tension effects around piston; • air buoyancy over masses; • liquid column head, • …. http://economie.fgov.be

  18. A measurement has metrological traceability if: • An unbroken and documented chain of calibrations links the instrument to an internationally agreed reference; • Each chain link has documented uncertainty estimations; • The final user has procedures to ensure that the instrument maintains its calibration with associated uncertainties over time; • The influence factors affecting the measurement are quantified and a total measurement uncertainty is calculated, documented and reported with the result. http://economie.fgov.be

  19. Questions? Askyour National Metrological Institute! http://www.bipm.org/en/practical_info/useful_links/nmi.html http://economie.fgov.be

More Related