Intro. Asset Management Case Study. Brian Baril, Solution Architect. Project Basis & Goals. Utility company, ~6,000 assets Desktops, servers, network devices (excludes apps) Experienced difficulty discovering & tracking assets Better change control needed – asset data is foundational

gella
Download Presentation

Intro

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intro Asset Management Case Study Brian Baril, Solution Architect

  2. Project Basis & Goals • Utility company, ~6,000 assets • Desktops, servers, network devices (excludes apps) • Experienced difficulty discovering & tracking assets • Better change control needed – asset data is foundational • Cost concerns (software and hardware related) • Service level & security / access concerns • Formerly used Novell products (Zen) • Decided on CMDB Implementation Project w/ BMC • Already a big AR / Remedy user • Strong BMC discovery capabilities (agent & agentless) • Most mature CMDB in marketplace (including integrations) • Full BMC config. management suite can be implemented over time • Desktop, Laptop, Server, Apps, Virt. Machines, Network, etc. • Noted increasing integration in BMC portfolio was happening year over year • Previous internal integration efforts had failed -- too risky and $$

  3. Project Overview • Discovery Systems • BCAC (Marimba), ootb • ADDM, ootb • Atrium CMDB Build & Integration • Simple recon work with these products, AIE, ootb • Approximate Project Timeline (overall, not consulting) • 3 – 4 months for design, testing, initial discovery & CMDB integration • Expect 2 – 3 months for addition of configuration management for PCs • Migration from Novell • Internal Team • One BCAC admin, also manages Zen currently (1 FTE for CM) • One ADDM admin, also manages Remedy • Project manager (1 of several projects, though this project has high visibility) • Consulting Support Used: • Discovery / CM expert • CMDB / Recon expert • Part-time consulting project management (1/2 day / week)

  4. Example: Virtual Machines

  5. Example: One Virtual Machine