1 / 24

Introduction Opportunity Requirements Our approach A pictorial r un t hrough the project

Introduction Opportunity Requirements Our approach A pictorial r un t hrough the project The product Progress with testing Where to from here?. Introduction Opportunity Requirements Our approach A pictorial r un t hrough the project The product Progress with testing

geoff
Download Presentation

Introduction Opportunity Requirements Our approach A pictorial r un t hrough the project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here?

  2. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here

  3. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here

  4. Requirements: • Economic viability (EROI, ROI) • Quiet • Reliable and long life • Good performance in turbulent, disturbed wind • Elegant, but with a low visual profile • Easy to own and operate • Domestic scale

  5. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here

  6. Our Approach..

  7. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here

  8. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here

  9. Thinair 102 Specifications Turbine type..................................... Horizontal axis, patented “teetering hub”, down wind, stall regulated Rotor diameter................................. 3.6m Swept area........................................ 10.2m2 Number of blades............................ 1 Blade material.................................. Carbon/glass fibre epoxy hybrid Rated power...................................... 2kW Rated wind speed............................ 10m/s Cut in wind speed............................ 3.5m/s Cut out wind speed......................... 20m/s Rated rotation speed..................... 370rpm Rotation speed range.................... 60-400rpm Alternator.......................................... Permanent magnet, axial flux, 3 phase, direct drive Inverter input................................... 200-400V DC Annual energy output at.............. 3250kWh 5m/s (average wind speed) Control system................................. Powerhouse Wind electronic control Turbine top of tower weight....... 70kg Minimum recommended.............. 8m tower height

  10. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here

  11. Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here?

  12. Where to from here? The big questions.. Does it work as it should? Can we make it for a sensible cost? Will customers buy it for a sensible price? Will we find a cornerstone investor in time? Strategy summary.. Early manufacturing Pilot marketing Development from there..

  13. Questions….?

More Related