240 likes | 364 Views
Introduction Opportunity Requirements Our approach A pictorial r un t hrough the project The product Progress with testing Where to from here?. Introduction Opportunity Requirements Our approach A pictorial r un t hrough the project The product Progress with testing
E N D
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here?
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here
Requirements: • Economic viability (EROI, ROI) • Quiet • Reliable and long life • Good performance in turbulent, disturbed wind • Elegant, but with a low visual profile • Easy to own and operate • Domestic scale
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here
Thinair 102 Specifications Turbine type..................................... Horizontal axis, patented “teetering hub”, down wind, stall regulated Rotor diameter................................. 3.6m Swept area........................................ 10.2m2 Number of blades............................ 1 Blade material.................................. Carbon/glass fibre epoxy hybrid Rated power...................................... 2kW Rated wind speed............................ 10m/s Cut in wind speed............................ 3.5m/s Cut out wind speed......................... 20m/s Rated rotation speed..................... 370rpm Rotation speed range.................... 60-400rpm Alternator.......................................... Permanent magnet, axial flux, 3 phase, direct drive Inverter input................................... 200-400V DC Annual energy output at.............. 3250kWh 5m/s (average wind speed) Control system................................. Powerhouse Wind electronic control Turbine top of tower weight....... 70kg Minimum recommended.............. 8m tower height
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here
Introduction Opportunity Requirements Our approach A pictorial run through the project The product Progress with testing Where to from here?
Where to from here? The big questions.. Does it work as it should? Can we make it for a sensible cost? Will customers buy it for a sensible price? Will we find a cornerstone investor in time? Strategy summary.. Early manufacturing Pilot marketing Development from there..