An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP4 - NGI / LGI Infrastructure ServicesSTATUS REPORTRamon Diacovo (WP4 Manager)UFRJ (Brazil)First Year Project ReviewBrussels, 15.09.2011

  2. Outline • Work Package Objectives • WP4 numbers • Success Thresholds • Future plans and conclusions

  3. Objectives • WP4 involvement on GISELA objectives • 1. “Ensure the sustainability of the EU-LA e-Infrastructure” • 1.1. “Establish a powerful e-Infrastructure facility built on the EELA-2 legacy” • Implement the catchall Grid Support Centre (GSC) • Implement a Grid Operations Centre (GOC) • Setup and operate the e-Infrastructure following the best practices recommended by EGI

  4. Objectives - catchall GSC • Handles site integration and support for countries with no NGI in place via ROC IGALC (http://www.igalc.org/) • Operates the prod.vo.eu-eela.eu VO • Every site on the e-Infrastructure has it configured • Monitoring system • Ticket submitting and following-up • Compliance with WP3 requests on specific support • Handles operations of IGALC sites

  5. Objectives - GOCs • Handle site integration and support within the countries (Colombia and Mexico) • Handle operations of sites within their countries (via ROC_LA in Colombia and Mexico) • Colombian sites soon to be moved to its NGI • Mexican GOC is acting as a seed for a future NGI

  6. Objectives - e-Infrastructure setup • The EGI GISELA* Resource Provider MoU • enables common procedures • grants GISELA access to EGI tools • promotes GISELA as an EGI certified Infrastructure provider • The GSC ensures that • Availability metrics are enforced • Ticket resolution times are minimised • GISELA profits from the already in place EGI procedures * signed by UFRJ on behalf of the GISELA consortium

  7. WP4 Numbers • Cumulative GISELA contribution per site (normalised CPU hours)

  8. WP4 Numbers • Contribution breakdown at M11 EU LA

  9. WP4 Numbers • Ticket resolution time distribution • 114 total tickets • more than 50% solved in 3 days or less • more than 75% solved in 7 days or less • Average resolution time: 5 days Average resolution time

  10. WP4 Numbers • CPU cores integration Year 1 Year 2 Pledge

  11. WP4 Numbers • “Extra” resources for the prod.vo.eu-eela.eu VO

  12. WP4 Numbers • e-Infrastructure availability

  13. Outline • Work Package Objectives • WP4 numbers • Success Thresholds • Future plans and conclusions

  14. Success Thresholds

  15. Outline • Work Package Objectives • WP4 numbers • Success Thresholds • Future plans and conclusions

  16. Plans for the second year • Keep integrating the resources as they are made available • Deploy the third GOC - current candidates are Argentina and Brazil • Assist the handover to CLARA in March, 2012 • Maintain quality support to WP3 specific community requests • Help to increase the average availability to meet Year 2 thresholds

  17. Conclusions • GSC and GOCs - working as intended • Operations - working as intended • Resources integration - slower than foreseen, but still moving • Non-partner sites supply the missing resources from the consortium