An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operations Management Session 25: Supply Chain Coordination

  2. Today’s Lecture • How information and incentives impact the performance? • Supply Chain Coordination • Vertical Integration Operations Management

  3. A Simplified Supply Chain Manufacturers Wholesale Distributors Suppliers Retailers Customers Goods Flow Revenue Flow Information Flow Operations Management

  4. Supply Chain Management (SCM) • Supply Chain Management (SCM) concerns the coordination and optimization of all supply, manufacturing, distribution and logistics activities from raw materials to finished goods to the customer. • SCM strives to use the supply chain as a mutually beneficial competitive tool. Operations Management

  5. Raw Materials Suppliers Component Manufacturer Systems Integrator Assembler Integrated Manufacturer Logistics Provider Distributor Customer Multiple Perspectives Operations Management

  6. SCM Goals • Maximize profits of all supply chain partners • How to do it? • Get the right product, in the right quantity, to the right customer at the right time with minimum cost, proper documentation and financial reconciliation • Difficulty: Each partner has its own goal Operations Management

  7. Channel Coordination • What are the objectives? • What is channel coordination? • Why are channels not coordinated? • How can we coordinate channels? Operations Management

  8. Channel Coordination: Example A single publisher sells a book to a retailer. Demand for the book is: Production cost (c) = 9 Revenue (p) = 39 Good-will (g) = 0 Holding cost (h) = 1 Whole sale price (w) = 19 Salvage value is assumed to be 0. Operations Management

  9. Decentralized Decision Making Simple Supply Chain Manufacturer Retailer Demand Production cost c Wholesale price w Selling price p Holding cost h Operations Management

  10. Decentralized Decision Making How much does the retailer order? Cu = p-w Co = w-0+h P(D≤ Q)= Cu/(Cu+Co) = (p-w)/(p-w+w+h) P(D≤ Q)= (p-w)/(p+h) Operations Management

  11. Centralized Decision Making What if the supply chain was vertically integrated? Manufacturer acquired retailer. Manufacturer Retailer Demand Production cost c Wholesale price w becomes irrelevant. Selling price p Holding cost h Operations Management

  12. Centralized Decision Making How much does the integrated company produce? P(D ≤ Q)=(p-c)/(p+h) Operations Management

  13. Question is… Which supply chain is better? Decentralized decision making Centralized decision making Operations Management

  14. Channel Coordination • Suppose each entity is independent. • How many books will the retailer stock? • P(D ≤ Base Stock) = (p – w) / (p + h) = (39 – 19) / (39 +1) = 20 / 40 = 0.50 • It is optimal for the retailer to stock 2,000 books. Operations Management

  15. Channel Coordination • What is the profit of the publisher? • 2000(19-9) = 20,000 • What is the expected profit of the retailer? Expected Salvaged = 0.2(2000 – 1000) = 200 Expected sold = 0.2(1000) + 0.8(2000) = 1800 • What is the profit of the retailer? • 1800(39-19) – 200(19+1) =36000-4000 = 32000 • What is the profit of the channel? • 32000 + 20000 = 52,000 Operations Management

  16. Channel Coordination: • Suppose you own both bookstore and the publisher: • What is the optimal number of books to be printed by the publisher and offered by the retailing department? • P(D ≤ Base Stock) = (p – c) / (p + h) = (39 – 9) / (39 + 1) = 30 / 40 =0.75 • It is optimal for the company to print 3000 books. Operations Management

  17. Channel Coordination • What is the optimal expected profit of the publishing company? • Expected profit = – Printing cost – Expected holding cost + Expected revenue Expected Salvaged = 0.2(3000 – 1000) + 0.3(3000-2000) = 700 Expected sold = 0.2(1000) + 0.3(2000) +0.5(3000)= 2300 • What is the profit of the retailer? 2300(39-9) – 700(9+1) =69000-7000 = 62000 Operations Management

  18. Question • Notice: The profit in the integrated company is $62,000 • The profit in the disintegrated company is only $52,000 • Why are they leaving some money on the table? • Double marginalization Operations Management

  19. Double Marginalization • What can be done to increase: • The channel profit • The publisher profit • The retailer profit • Recall that there is $10,000 on the table. Operations Management

  20. Channel Coordination: Solutions Type of channel coordination solutions Buy back Revenue Sharing Vendor Managed Inventory (VMI) Consignment Options Operations Management

  21. Double Marginalization: The Solution • Suppose the publisher is willing to purchase back all the excess inventory • In return for this service, he might change the wholesale price Operations Management

  22. Double Marginalization A Solution • Example: • Production cost (c) = 9 • Revenue (p) = 39 • Goodwill (g) = 0 • Holding cost (h) = 1 • Wholesale price (w) = 12 • Buy back price = 4 • What is the retailer service level? • P(D≤Q) = (39 – 12)/(39+1 – 4) = 27/36 = 0.75 • Exactly the same as the integrated system Operations Management

  23. Double Marginalization: A Solution • It is optimal for the retailer to purchase 3,000 units. • The retailer’s profit: = – 3000*12 – (1 – 4)*{0.2*(3000 – 1000)+0.3*(3000 – 2000)} + 39*{0.2*1000+0.3*2000+0.5*3000} = – 36000 + 3*(400+300) + 39*(200+600+1500) = – 36000 + 2100 + 39*2300= – 36000 + 84000 = $55,800 The retailer’s profit is $55,800. Operations Management

  24. Double Marginalization: The Solution • What is the profit of the publisher? = 3000*(12 – 9) – 4*{0.2*2000+0.3*1000} = 9000 – 2800 = 6200 • What is the channel profit? • 55800+6200 = $62,000 • The same profit as the integrated system. • Why is the profit the same? • Has the problem been solved? Operations Management

  25. Review • Previously: • Profit publisher: $20,000 • Profit retailer: $32,000 • System with buy back • Profit publisher: $6,200 • Profit retailer: $55,800 • Do you think implementing the buy back system is feasible? Operations Management

  26. Double Marginalization: The Solution • We must ensure that both publisher and retailer benefit • How can we do that? • (p – w) / (p + h – b) = 0.75 (39 – w)/(39+1 – b) = 0.75 39 – w = 30 – 0.75b 9 + 0.75b = w • All pairs (w,b) that satisfy the above equation will coordinate the channel. • When the channel is coordinated the retailer will purchase 3000 units. Operations Management

  27. Double Marginalization: The solution • For some pairs (w,b), both players will benefit from coordination: • When w = 21 then b = 16 • The service level is: (39–21)/(39+1–16) = 18/24=0.75 • Publisher profit = 3000 * (21 – 9) – 16*{0.2*2000+0.3*1000} = 36000 – 10200 = $25,800 • Retailer profit = $36,200 • Both players gained by the buyback arrangement Operations Management

  28. Buy Back: General Solution • General solution: • Find a solution such that: Operations Management

  29. Vertical Integration No Integration Downstream Integration Upstream Integration Assembly Operations Management

  30. Article Reading • "Back to the Future: Benetton Transforms it’s Global network" MIT Sloan management Review, Fall 2001. Operations Management

  31. Benetton • Factors contributing to success • Delayed dyeing • Network organization for manufacturing • Network organization for distribution • Benetton’s strategy in supply chain management • Product design (customized by region) • Supply and production (strong upstream vertical integration) • Retail network (mixed downstream vertical integration) • Diversifying into sports Operations Management

  32. Vertical Integration • To decide whether to vertically integrate, consider: • Cost: Cost of market transactions between firms vs. cost of administering the same activities internally within a single firm • Control: Impact of asset control, which can impact barriers to entry and which can assure cooperation of key value-adding players. • Coordination/Information Sharing Operations Management

  33. Vertical Integration: Drawbacks • Capacity balancing issues • For example, the firm may need to build excess upstream capacity to ensure that its downstream operations have sufficient supply under all demand conditions. • Potentially higher costs • Due to low efficiencies resulting from lack of supplier competition. • Economy of scale/risking pooling from outsourcing Operations Management

  34. Factors against Vertical Integration • The vertically adjacent activities are in very different types of industries. For example, manufacturing is very different from retailing. • The addition of the new activity places the firm in competition with another player with which it needs to cooperate. The firm then may be viewed as a competitor rather than a partner. Operations Management

  35. Alternatives to Vertical Integration • Long-term explicit contracts • Franchise agreements • Joint ventures • Co-location of facilities • Implicit contracts (relying on firms' reputation) Operations Management