Extra Homework Required for Friday. Provide me with an updated copy of your resume. Isolation of Process Equipment. Terry A. Ring. Discussion Item 1 for Next Time.
E N D
Extra Homework Required for Friday • Provide me with an updated copy of your resume.
Isolation of Process Equipment Terry A. Ring
Discussion Item 1 for Next Time • Develop a system to remove a pump from operation while pumping a mixture of trichlorosilane and silicon tetra chloride to a distillation column.
Discussion Item 2 for Next Time • Develop a system to remove a pump/check valve system from operation while pumping a mixture of trichlorosilane and silicon tetra chloride to a distillation column.