1 / 14

A Hybrid Ion Source Concept for a Proton Driver Front-End

ICFA-HB 2004 Workshop. A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller , P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and D. Syversrud Lawrence Berkeley National Laboratory, Berkeley, CA, USA and

Download Presentation

A Hybrid Ion Source Concept for a Proton Driver Front-End

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICFA-HB 2004 Workshop A Hybrid Ion Source Conceptfor a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. WalligM. Monroy, A. Ratti, and D. SyversrudLawrence Berkeley National Laboratory, Berkeley, CA, USA and R. Welton and D. AndersonSNS-Oak Ridge National Laboratory, Oak Ridge, TN, USA Bensheim, Oct. 21, 2004

  2. Acknowledgments John Staples LBNL 2 & 13-MHz rf matching Richard Pardo ANL Microwave ECR ion source Bob Scott ANL Microwave ECR ion source

  3. Background Sources of intense H- beams are needed for future Proton Driversthat include Accumulator Rings Specifically, the Spallation Neutron Source (SNS) needs to pursue cutting-edge technology in areas critical to accelerator operation • To ensure adequate performance • Linac and Ring commissioning • 1.44-MW production beam • Future power upgrade towards 3 MW and higher • Ion source and beam-formation system constitute such an area • H- beam production is particularly complex and challenging • R&D investment in this area is highly cost effective Develop ion sources with highest levels of performance and reliability • First phase of work aims at improving reliability and availabilityof the plasma generator (the “ion source proper”) • At least 500 hours of time-between-services

  4. Original SNS Ion Source and LEBTAreas for Improvement Plasma Generation Beam Formation Electron Dumping LEBT

  5. HYBRIS Development Plan • Abandon standard SNS 2 & 13-MHz rf technology, including • Internal, porcelain coated antenna • 2-MHz amplifier and impedance matcher • Main-plasma generation by pulsed d.c. discharge • Proven to work for H- production with filaments (e. g. KEK, JAERI) • Sustain main discharge by microwave-driven plasma cathode • No need for thermionic filaments • No build-up of surface-poisoning deposits • 2.45-GHz ECR plasma generators have proven extremely long lifetime and reliability as proton sources (e. g. LANL-LEDA, CEA Saclay) • Attempts to produceintense H- beamsdirectlyin ECR ion source were moderately successful (~1mA beam current, e. g. TRIUMF, CEA Saclay) • Controlling electron energy in main discharge vessel will be crucial

  6. Performance Parameters • Established SNS ion-source performance • ~55 mA at about 0.1% duty factor • 51 mA transported through LEBT, RFQ, and MEBT • 2.5 weeks with 33 mA at 7.4% d. f. through LEBT • 0.12 p mm mrad normalized rms emittance • 60 mA at 1.2 ms, 20 Hz through LEBT • Modified cesium collar/outlet aperture (see ICFA-HB 2002) • 0.35 p mm mrad normalized rms emittance • Ultimate HYBRIS performance goals • 75 mA peak H- beam current • 0.25 p mm mrad normalized rms emittance • 12% duty factor • 2 months interval between services

  7. HYBRIS Layout

  8. HYBRIS Electrical Circuit 0 - 20 sccm 0 - 100 sccm Cesium Collar/ Outlet Ion Extractor Faraday Cup Microwave Chamber Electron Extractor Discharge Cathode Discharge Chamber Electron Dump Waveguide HV Break ECR H- 60 Hz 1 ms 1W - + - + - + - + - + 150 V 20 kV 150 V 6 kV 50 kV 1 A 0.1 A 5 A 0.4 A 0.2 A Hot Deck

  9. Envisaged Operational Parameters

  10. Status of HYBRIS Development • 2.45-GHz ECRIS obtained on loan from Argonne Nat. Lab. • Chalk River Nat. Lab. model • Test stand assembled • Discharge pulser received from SNS and tested • Baseline test with rf-driven SNS prototype ion source performed • Capacitive rf impedance matcher worked very well • ECR ion source operated • Immediately produced intense electron beam • Electron beam current limited by uncooled extractor tube • So far, operated barely above ECR threshold for 2.45 GHz • HYBRIS extraction chamber built and assembled • Modified, cooled, extractor tube • First test imminent • Still a low-budget effort

  11. HYBRIS ECR Discharge Vessel Electron Extraction H- Discharge Vessel

  12. HYBRIS Test Stand Tuner Directional CouplersHV Break Dummy Load Magnet Coils Vacuum Tank

  13. Future Developments • Optimize ECR discharge chamber as a plasma cathode • Simplify magnetic field generation • Use one solenoid coil only - or permanent magnets • Reduce electron extraction voltage • Reduce distance between ECR and H- discharge chambers • Electron dumping mechanism • LEBT layout

  14. Summary • Hybrid Ion Source under development • Aimed at producing high-current H- beamsat high duty factor with very high reliability • Combining three well proven concepts • Pulsed d.c. main discharge • Microwave-driven plasma cathode • H- production chamber of existing SNS ion source • H- ion production still to be demonstrated • Principal unproven issue is control of the electron temperature in the H- production chamber • Areas of future developments identified

More Related