Updates on AIDA, LYCCA, and MBS involving FEE64 production, testing, and integration for upcoming October experiment at GSI. Includes electronic testing progress, cooling pad manufacturing, mechanical parts availability, and plans for system installation and design. Highlight on successful data integration with MBS interface.

gerodi
Download Presentation

FEE64 Production Report & Preparation for October Test

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test.

  2. LYCCA test and MBS A single FEE64 card with mezzanine was mounted on the central aluminium support and along with top cooling plate was plugged via the LYCCA adaptors into a LYCCA silicon detector in the LYCCA chamber at GSI. The cooling was provided by a fan and aluminium cooling blocks. The MBS interface was used, successfully, to integrate data with the MBS system.

  3. Production of FEE64 • Electronics testing is proceeding. • Cooling pads for the AIDA modules are being manufactured. A modified set of pads has been ordered. • Mechanical parts for the modules are in stock.

  4. Preparation for the October test • 6th June , meeting to discuss installation of a system inT4 that will be shipped to GSI for the October experiment. • Designing the MACB to integrate the 12 FEE64 cards ( 6 modules ) into a system. • Problem with HDMI connection.