WW l n l n Analysis Status
WW l n l n Analysis Status. Yusheng Wu UM Di-boson Meeting 9/17/2010. WW l n l n Cut Flows (Period A-F, 3.1pb -1 ). 15 Candidates in total After jet veto, 3 candidates (1ee,1e m ,1 mm ) ~ 3 pb -1 MC Expectation has discrepancy with Data (-1). MC Background Estimation.
141 views • 6 slides