PCS Link • I-TMS 3 • PCS IT Day • 23.11.2017
Agenda • Preconditions • From ROMAN to PCS Link PCS Link
Preconditions • PROCESS TYPES: • In scope : • New Path Requests • LatePath Requests • Out of scope: • Studies • Ad Hoc • Path modification • Path Alteration PCS Link
Preconditions • PROCESS PHASES: • In scope : • Path Elaboration • Post Processing PCS Link
Preconditions • TYPE OF DOSSIERS: • In scope : • Commercial trains (+ only the commercial part of the train) • Passengers • Goods • PAP • no PAP • Out of scope : • Emptyruns PCS Link
Preconditions • One way: planningstool PCS • Only update of the trainschedule in PCS • No automatic update of the trafic lights (remainsmanual) PCS Link
From ROMAN to PCS • ROMAN: • Our national planningstool for the “long term”-planning • Developed by Atos Wordline PCS Link
From ROMAN to PCS • Link with PCS: • Daily transfer of data from ROMAN to PCS • Link is made via: • PCS dossier number • PCS path number PCS Link
From ROMAN to PCS • Link with PCS: PCS Link
From ROMAN to PCS PCS Link
From ROMAN to PCS • Link with PCS: • Comparison between the path of ROMAN and the path of PCS • Only check of: • (National) Trainnumber • Locations (stops, run through, border, …) • Times • Activity type (run through, commercial stop, …) • Location type (origin, handover, destination, …) • Loco type • Train length (commercial + overall) • For freight trains only: • Braking regime • PC-codification • Weight (commercial + overall) PCS Link
From ROMAN to PCS • Link with PCS: • Case 1: (# running days in PCS) <> (# running days in ROMAN) PCS Link
From ROMAN to PCS • Link with PCS: • Case 2: (# running days in PCS) = (# running days in ROMAN) PCS Link