An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11

  2. 1) FACTS

  3. 1) FACTS • 3 major events in 30 min (11:03, 11:11, 11:34) • Discrimination not easy but last was worst (short on Verbois OHL) • Impact on several points (starting contact: EHT2 pulsed, Diesel network, Meyrin admin. loop) • False intertrip on MP7 (second in a row after 3 month of storms) • Autotransfer failed to refeed SEM12 (Io on couplers)

  4. 1) FACTS

  5. 1) FACTS • Situation after autotransfert 11:34:48 • All machines off • LHC loop and ATLAS partially off • MEYRIN reenergized from Swiss network • DIESEL generators started well on all LHC points • Situation after Piquet reconfiguration 13:50 • Piquet at work at 12:15 (difficult to understand) • fail to refeed loop from LHC2 ( Io) at 12:58 • LHC loop fed from LHC2 (in two steps) 13:28 • ATLAS fully refed at 13:49 • Network back to the standard configuration at 16:00

  6. 1) FACTS

  7. 2) ANALYSIS • Another false intertrip on MP7 • second in a row after 3 months of storm seasons • intertrip will be deactivated ASAP • Fiber optics will be installed for intertrips • Io twice attempting to reenergized SEM12 (LHC loop + ATLAS) • No explanation yet • Unexpected and complex situation for Standby service • 2h15 before renergizing LHC1 (too long)